USF-CUTR I-4 FRAME Project "After" Study: Data Collection and Analysis of Safety and Mobility Conditions After Implementation

This research project will collect and analyze “after” data for applications allocated to USF-CUTR, perform a before-after study to evaluate impacts and improvements of the deployed I-4 FRAME applications, conduct an overall benefit-cost analysis for the I-4 FRAME project Connected Vehicle (CV) applications, perform satisfaction survey and analysis of I-4 FRAME CV Apps users, and document research findings and recommendations. The primary project objectives and efforts from the USF-CUTR team include the following: (1) complete “after” data collection for 10 selected I-4 FRAME applications allocated to USF-CUTR, addressing mobility challenges and benefit-cost analysis, and collect sample data during pre-deployment to minimize data gaps in the before-after data analysis; (2) evaluate impacts and improvements to mobility and safety from 10 selected applications via before-after studies; (3) address mobility challenges on I-4 FRAME project corridors; (4) perform an overall benefit-cost analysis for the 10 applications allocated to USF-CUTR; (5) conduct a satisfaction survey and analysis of I-4 FRAME users; and (6) document results of before-after studies, impact of I-4 FRAME application, benefit-cost analysis, user satisfaction survey, research findings, and recommendations.

    Language

    • English

    Project

    • Status: Active
    • Funding: $344196
    • Contract Numbers:

      BED25 977-15

    • Sponsor Organizations:

      University of South Florida, Tampa

      Department of Civil and Environmental Engineering
      4202 E. Flowler Avenue, ENB 118
      Tampa, FL  United States  33620-5350
    • Managing Organizations:

      Florida Department of Transportation

      Research Center
      605 Suwannee Street MS-30
      Tallahassee, FL  United States  32399-0450
    • Project Managers:

      Wong, Edith

    • Performing Organizations:

      University of South Florida, Tampa

      Department of Civil and Environmental Engineering
      4202 E. Flowler Avenue, ENB 118
      Tampa, FL  United States  33620-5350
    • Principal Investigators:

      Lin, Pei-Sung

    • Start Date: 20230417
    • Expected Completion Date: 20270831
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01879339
    • Record Type: Research project
    • Source Agency: Florida Department of Transportation
    • Contract Numbers: BED25 977-15
    • Files: RIP, STATEDOT
    • Created Date: Apr 17 2023 3:26PM