SPR-2313: Repair of Steel Beam/Girder Ends with Ultra High-Strength Concrete, Phase III: Implementation and Training
This project is proposed to enable the broad implementation of the repair method on different bridges with end corrosion problems. This entails devising a forming system that is adaptable to a large number of bridges and developing a simplified and automatized design process to enable rapid in-house designs. In addition to the improved forming and design processes, instrumentation of Bridge No. 03094 and Bridge No. 05844A will be provided to validate the structural performance of the repair and provide the knowledge necessary for future designs. To achieve these objectives, the UCONN team will work closely with the maintenance, design, and safety departments of the Connecticut Department of Transportation (CTDOT). As the objective is to promote widespread implementation of the repair, working closely with CTDOT to understand their concerns and incorporate their ideas is crucial to the success of the project. The tasks involved over the course of the project include to: (1) develop tools that can be used by CTDOT to quickly design repairs; (2) test an alternative shear connector for repair; (3) support the Bridge No. 03094 and Bridge No. 05844A repair designs; (4) conduct push-off tests on weathering steel beams; and, (5) instrument and monitor the Bridge No. 03094 and Bridge No. 05844A repairs.
Language
- English
Project
- Status: Active
- Funding: $635,873
-
Contract Numbers:
SPR-2313
-
Sponsor Organizations:
Connecticut Department of Transportation
2800 Berlin Turnpike
P. O. Box 317546
Newington, CT United States 06131-7546 -
Managing Organizations:
Connecticut Department of Transportation
2800 Berlin Turnpike
P. O. Box 317546
Newington, CT United States 06131-7546 -
Project Managers:
Zimyeski, Melanie
-
Performing Organizations:
University of Connecticut, Storrs
Connecticut Transportation Institute
270 Middle Turnpike, Unit 5202
Storrs, CT United States 06269-5202 -
Principal Investigators:
Hain, Alexandra
Zaghi, Arash
- Start Date: 20181009
- Expected Completion Date: 20230630
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Bridges; Corrosion; Implementation; Repairing; Training; Ultra high performance concrete
- Subject Areas: Bridges and other structures; Education and Training; Highways; Maintenance and Preservation; Materials;
Filing Info
- Accession Number: 01853894
- Record Type: Research project
- Source Agency: Connecticut Department of Transportation
- Contract Numbers: SPR-2313
- Files: RIP, STATEDOT
- Created Date: Aug 2 2022 5:16PM