Estimating the As-Placed Grout Volume of Auger Cast Piles
The first objective of this research project is to obtain field data from ACIP pile projects to better correlate the measured grout volume to the as-built pile dimensions. A second objective is to develop a more reliable method for estimating grout volume by identifying the variables that affect pile volume other than the simplistic approaches used to date. These variable are likely to include but are not limited to soil type, construction means methods, and types of equipment.
Language
- English
Project
- Status: Active
- Funding: $176352
-
Contract Numbers:
BED25 977-04
-
Sponsor Organizations:
University of South Florida, Tampa
Department of Civil and Environmental Engineering
4202 E. Flowler Avenue, ENB 118
Tampa, FL United States 33620-5350 -
Managing Organizations:
Florida Department of Transportation
Research Center
605 Suwannee Street MS-30
Tallahassee, FL United States 32399-0450 -
Project Managers:
Castellanos, Juan
-
Performing Organizations:
4202 East Fowler Ave, FAO126
Tampa, Fl United States 33620 -
Principal Investigators:
Mullins, Gray
- Start Date: 20220331
- Expected Completion Date: 20240430
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Cast in place structures; Grout; Piles (Supports)
- Subject Areas: Bridges and other structures; Construction; Transportation (General);
Filing Info
- Accession Number: 01841074
- Record Type: Research project
- Source Agency: Florida Department of Transportation
- Contract Numbers: BED25 977-04
- Files: RIP, STATEDOT
- Created Date: Mar 29 2022 11:13AM