Economical Impact of Full Closure for Accelerated Bridge Construction and Conventional Staged Construction
The main goal of this research project is to develop a cost-estimating decision support tool for all bridge construction methods, including conventional staged construction, accelerated bridge construction (ABC) methods with limited closure, and ABC with full closure. The proposed decision support tool will be designed to enable Illinois Department of Transportation (IDOT) decision-makers to develop and compare accurate cost estimates of all feasible bridge construction methods in order to identify an optimal selection from this set of alternative methods. To accomplish this goal, the research objectives of this project are as follows: (1) Develop a parametric cost-estimating decision support tool to enable IDOT designers and decision-makers to accurately estimate the total and life cycle cost of all feasible bridge construction methods including (a) conventional staged construction; (b) ABC methods with a limited closure times (e.g. 3 day, 7 day, and 21 day); and (c) ABC method with full closure and detour. (2) Develop guidelines that can be used by IDOT planners to identify all feasible bridge construction methods for any bridge construction project based on its specific characteristics, requirements, and constraints. (3) Analyze case studies that include a representative sample of completed IDOT bridge projects to evaluate and refine the performance and accuracy of the developed cost-estimating decision support tool. (4) Develop guidelines that can be used by IDOT bridge and roadway project planners to compare and rank all feasible bridge construction methods based on their individual performance in construction costs, road user costs, and life cycle costs.
Language
- English
Project
- Status: Active
- Funding: $149982
-
Contract Numbers:
R27-242
-
Sponsor Organizations:
Illinois Department of Transportation
Bureau of Materials and Physical Research
126 East Ash Street
Springfield, IL United States 62704-4766 -
Managing Organizations:
University of Illinois, Urbana-Champaign
Illinois Center for Transportation
1611 Titan Drive
Rantoul, IL United States 61866 -
Principal Investigators:
El-Rayes, Khaled
El-Gohary, Nora
Golparvar-Fard, Mani
Ignacio, Ernest-John
- Start Date: 20210816
- Expected Completion Date: 20230815
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Bridge construction; Cost estimating; Decision support systems; Lane closure
- Subject Areas: Bridges and other structures; Construction; Highways; Planning and Forecasting;
Filing Info
- Accession Number: 01778892
- Record Type: Research project
- Source Agency: Illinois Department of Transportation
- Contract Numbers: R27-242
- Files: RIP, STATEDOT
- Created Date: Aug 9 2021 11:25AM