Curved Integral Abutment Bridge Design
This project’s objective is to develop guidelines for the design of curved integral abutment bridges. These guidelines should address recommendations for span length, total bridge length and degree of curvature and skew, with modeling recommendations for design which are consistent with the current American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design Specifications.
Language
- English
Project
- Status: Active
-
Sponsor Organizations:
New England TRansportation Consortium
16 State House Station
Augusta, ME United States 04333 -
Managing Organizations:
Maine Department of Transportation
Research Division, Child Street, 16 State House Station
Augusta, ME United States 04333-0016 -
Project Managers:
Peabody, Dale
- Start Date: 20200228
- Expected Completion Date: 0
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Bridge abutments; Bridge design; Curvature; Guidelines; Load and resistance factor design; Skew bridges
- Identifier Terms: AASHTO LRFD Bridge Design Specifications
- Subject Areas: Bridges and other structures; Design; Highways;
Filing Info
- Accession Number: 01730602
- Record Type: Research project
- Source Agency: Maine Department of Transportation
- Files: RIP, STATEDOT
- Created Date: Feb 6 2020 4:05PM