2311 In-Stream Structures Integrity and Channel Stability Survey and Evaluation

In order to reduce impacts on infrastructure within river floodplains, particularly bridges and hydraulic structures, river control or in-stream structures are installed to reduce the impact of peak flows from large flood events. Many of these structures were installed over 50 years prior, but are not routinely evaluated for effectiveness and/or integrity after large storm events, (100-500 year storms). Previously, two ODOT studies (1971 and 1989) have compared the effectiveness of over 20 river-control and streambank-stabilization structures near transportation infrastructure. The results of these studies provide a unique opportunity to build on and enhance the present-day understanding of long-term effectiveness of these structures to limit channel migration and maintain structural function. The proposed project would add to and enhance previous studies through geomorphic surveys and in-depth analysis of the characteristics of installed in-stream structures and stream geomorphology to inform ODOT engineers on causes of survival or failure due to large flooding events over the long term. This information will improve ODOT’s understanding of the effectiveness and integrity of river control structures and inform development of standard characteristics and methods for design and installation of resilient instream structures for protection of transportation infrastructure.

    Language

    • English

    Project

    • Status: Active
    • Funding: $94,000
    • Contract Numbers:

      2311

      SPRY-0010(082)RS

    • Sponsor Organizations:

      Oklahoma Department of Transportation

      200 NE 21st Street
      Oklahoma City, OK  United States  73105
    • Managing Organizations:

      Oklahoma Department of Transportation

      200 NE 21st Street
      Oklahoma City, OK  United States  73105
    • Project Managers:

      Lewis, Leslie

      Hook, Gary

    • Performing Organizations:

      University of Oklahoma, Norman

      School of Civil Engineering and Environmental Science
      202 West Boyd Street, Room 334
      Norman, OK  United States  73019
    • Principal Investigators:

      Vogel, Jason

    • Start Date: 20191001
    • Expected Completion Date: 20210930
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01722864
    • Record Type: Research project
    • Source Agency: Oklahoma Department of Transportation
    • Contract Numbers: 2311, SPRY-0010(082)RS
    • Files: RiP, STATEDOT
    • Created Date: Nov 19 2019 11:25AM