Crash Testing of a Precast Concrete Barrier TPF-5(367)
This research proposal has been submitted in response to the Iowa Department of Transportation’s Pooled Fund Study No. TPF-5(367), which evolved from Solicitation Number 1436. The Pooled Fund Study was originally entitled, Evaluation and Crash Testing of Concrete Prefabricated Bridge Rails. As requested, the Midwest Roadside Safety Facility (MwRSF) of the University of Nebraska-Lincoln (UNL), partnered with the Institution for Transportation (InTrans) at Iowa State University (ISU), is submitting one research proposal, which is entitled: Crash Testing of a Precast Concrete Barrier. The budget for $414,128 and corresponds to the construction of a 130-ft long bridge rail and a reduced 75-ft long bridge deck with support structure.
Language
- English
Project
- Status: Active
- Funding: $414128
-
Contract Numbers:
TPF-5(367)
-
Sponsor Organizations:
Iowa Department of Transportation
800 Lincoln Way
Ames, IA United States 50010 -
Managing Organizations:
University of Nebraska, Lincoln
1400 R Street
Lincoln, Nebraska United States 68588 -
Project Managers:
Clute, Khyle
-
Performing Organizations:
Iowa Department of Transportation
800 Lincoln Way
Ames, IA United States 50010 -
Principal Investigators:
Clausen, David
- Start Date: 20190501
- Expected Completion Date: 20210331
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Barriers (Roads); Bridge decks; Bridge railings; Impact tests; Precast concrete
- Subject Areas: Bridges and other structures; Highways; Safety and Human Factors;
Filing Info
- Accession Number: 01702856
- Record Type: Research project
- Source Agency: Iowa Department of Transportation
- Contract Numbers: TPF-5(367)
- Files: RIP, STATEDOT
- Created Date: Apr 24 2019 11:09AM