Proof-of-Concept Research of Roadside LiDAR Sensing Multimodal Traffic (NDOT 744-18-803)

Existing data collection methods do not capture the level of detail and accuracy needed to accommodate newer traffic systems and applications, specifically multimodal all-traffic trajectories. Utilizing 360-degree light detection and ranging (LiDAR) sensors to attain proof-of-concept research to evaluate the accuracy, reliability and efficiency of the developed algorithms and roadside LiDAR sensing systems for various traffic scenarios and applications. Validate the feasibility of using roadside LiDAR sensors to provide high-accuracy, multimodal traffic trajectories by testing with different sensors, deployment methods, and traffic scenarios; and apply roadside LiDAR data to support connected and autonomous vehicles (CAVs), enhance traffic mobility/safety analysis, and integrate with existing traffic infrastructure for automatic pedestrian/wildlife warning. This project is at the First Application Field Pilot Stage and will provide proof-of-concept results for NDOT to understand the accuracy, reliability, and possible applications of roadside LiDAR sensing systems in various real-world scenarios. If the performance of the proposed technology is approved and accepted, NDOT can start to consider its application in wider and more diverse regions of Nevada. The systems, experience, and guidance developed in this project will directly guide the implementation of roadside LiDAR sensing systems. The next stage will be actual field implementation at prioritized intersections/corridors.

    Language

    • English

    Project

    • Status: Active
    • Funding: $309,581.00
    • Contract Numbers:

      744-18-803

    • Sponsor Organizations:

      Nevada Department of Transportation

      1263 South Stewart Street
      Carson City, NV  United States  89712

      Federal Highway Administration

      1200 New Jersey Avenue, SE
      Washington, DC  United States  20590
    • Managing Organizations:

      Nevada DOT Research

      1263 South Stewart St
      Carson City, Nevada  United States  89712
    • Project Managers:

      Schilling, Rod

      Smith, Casey

      Kumar, Manjunathan

    • Performing Organizations:

      University of Nevada, Reno

      1664 N. Virginia Street
      Reno, Nevada  United States  89557
    • Principal Investigators:

      Xu, Hao

    • Start Date: 20190211
    • Expected Completion Date: 20190430
    • Actual Completion Date: 0
    • USDOT Program: Transportation, Planning, Research, and Development
    • Subprogram: Research

    Subject/Index Terms

    Filing Info

    • Accession Number: 01698698
    • Record Type: Research project
    • Source Agency: Nevada Department of Transportation
    • Contract Numbers: 744-18-803
    • Files: RiP, STATEDOT
    • Created Date: Mar 8 2019 4:55PM