Assessment and Evaluations of I-80 Truck Loads and Their Effects: Phase 2: Service

The goal of this study is to quantify impacts of truck traffic on selected freeway segments along I-80 in WY and propose potential mitigation strategies, through analyses of operational and safety implications that result from the interactions between trucks and passenger vehicles. A special attention will be given to the roadway geometry (horizontal and vertical alignment, as well as the existing climbing lanes) and traffic characteristics to identify impacts on traffic efficiency and safety. The analysis will include the effectiveness of existing climbing lanes, and identify potential locations where the introduction of climbing lanes will be justified. Other control strategies, such as different speed limits for trucks, truck lane restrictions along certain segments, and truck no-passing zones will also be analyzed. Differential speed limits for trucks have been implemented by some US states, so this study will review and summarize the state of practice and its effectiveness on operations and safety. Another potential issue with truck traffic on WY freeways is the speed limit of 80 mph along certain segments. This raises a concern of the ability of conventional truck tires to handle such high speeds. The study will investigate this issue through a review of literature and practice, as well as through crash data analysis to identify the potential relationship between truck tire failure and crash characteristics.

Language

  • English

Project

  • Status: Active
  • Funding: $143184
  • Contract Numbers:

    RS06218

  • Sponsor Organizations:

    Wyoming Department of Transportation

    5300 Bishop Blvd.
    Cheyenne, WY  United States  82009-3340
  • Project Managers:

    Carlson, Matt

  • Performing Organizations:

    University of Wyoming, Laramie

    1000 E University Avenue, Department 3295
    Laramie, WY  United States  82071
  • Principal Investigators:

    Zlatkovic, Milan

    Ksaibati, Khaled

  • Start Date: 20180221
  • Expected Completion Date: 20200331
  • Actual Completion Date: 0

Subject/Index Terms

Filing Info

  • Accession Number: 01669015
  • Record Type: Research project
  • Source Agency: Wyoming Department of Transportation
  • Contract Numbers: RS06218
  • Files: RiP, STATEDOT
  • Created Date: May 15 2018 1:54PM