Study of Temporal Pavement Cracking in 3D to Determine Optimal Time and Cost-Effective Treatment Methods

Develop a guide to document the procedure to determine the optimally cost-effective jointed plain concrete pavement (JPCP) maintenance and rehabilitation plan that minimizes the cost and the potential risk for Georgia Department of Transportation (GDOT) (e.g., crack propagation); it will incorporate the actual deterioration behavior at both slab and segment/project levels.


    • English


    • Status: Active
    • Contract Numbers:

      GDOT RP 16-01

    • Sponsor Organizations:

      Georgia Department of Transportation

      One Georgia Center
      600 West Peachtree Street, NW
      Atlanta, GA  United States  30308
    • Project Managers:

      Ahmed, Yusuf

    • Performing Organizations:

      Georgia Tech Research Corporation

      505 Tenth Street
      Atlanta, GA  United States  30332-0420
    • Principal Investigators:

      Tsai, Yi-Chang James

      Wang, Zhaohua

    • Start Date: 20160825
    • Expected Completion Date: 20180225
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01610397
    • Record Type: Research project
    • Source Agency: Georgia Department of Transportation
    • Contract Numbers: GDOT RP 16-01
    • Files: RiP, STATEDOT
    • Created Date: Sep 9 2016 10:31AM