Rapid Bridge Deck Joint Repair Investigation - Phase III, RB33-013

The objective of this additional scope is to develop designs for "minimum concrete removal" and "deck sliding over the backwall" type concepts, based on the findings from the previous phases of this research project. To this end, candidate bridges will firstly be selected and modeled using Finite Element (FE) method. Based on FE results, the researchers will assist Iowa DOT designers to develop plans that conform to the design concepts. Lastly, a plan for construction observation and post-construction testing will be developed. Various options will be considered during the design development process, e.g., expansion joint type, size and shape of expansion joint, anchorage, amount of concrete removal, way to provide reinforcing bar continuity precast vs. cast in place panel, joints between new panels and existing structures, and others.

  • Supplemental Notes:
    • Continuation of Phase II.

Language

  • English

Project

  • Status: Active
  • Funding: $100,000
  • Contract Numbers:

    RB33-013

    ISU Proposal 128788

    Addendum 451

  • Sponsor Organizations:

    Iowa Department of Transportation

    800 Lincoln Way
    Ames, IA  United States  50010
  • Managing Organizations:

    Iowa Department of Transportation

    800 Lincoln Way
    Ames, IA  United States  50010
  • Project Managers:

    Nelson, James

  • Performing Organizations:

    Iowa State University, Ames

    Institute for Transportation
    2711 South Loop Drive, Suite 4700
    Ames, Iowa  United States  50010-8664
  • Principal Investigators:

    Jahren, Charles

    Chen, An

  • Start Date: 20130101
  • Expected Completion Date: 20201231
  • Actual Completion Date: 0

Subject/Index Terms

Filing Info

  • Accession Number: 01590086
  • Record Type: Research project
  • Source Agency: Iowa Department of Transportation
  • Contract Numbers: RB33-013, ISU Proposal 128788, Addendum 451
  • Files: RIP, STATEDOT
  • Created Date: Feb 10 2016 4:04PM