Using Small Sample Sizes in Full Depth Reclamation (FDR) Laboratory Mix Designs

Currently, single laboratory Full Depth Reclamation (FDR) design takes between 300 and 400 lbs. of existing highway material for sampling. The current process is problematic as it leaves patches requiring future maintenance and limits the ability to perform dual stabilizer treatments as well as multiple location testing. In addition, the current test methods for a single design take a significant period of time to complete (1 month in some situations).

Language

  • English

Project

  • Status: Completed
  • Funding: $130000.00
  • Contract Numbers:

    5-6271-03

  • Sponsor Organizations:

    Texas Department of Transportation

    125 E. 11th Street
    Austin, TX  United States  78701-2483
  • Project Managers:

    Adams, Joe

  • Performing Organizations:

    Texas Transportation Institute

    Texas A&M University System
    3135 TAMU
    College Station, TX  United States  77843-3135
  • Principal Investigators:

    Scullion, Tom

  • Start Date: 20140711
  • Expected Completion Date: 0
  • Actual Completion Date: 20151031
  • Source Data: RiP Project 39980

Subject/Index Terms

Filing Info

  • Accession Number: 01569086
  • Record Type: Research project
  • Source Agency: Texas Department of Transportation
  • Contract Numbers: 5-6271-03
  • Files: RiP, STATEDOT
  • Created Date: Jul 1 2015 2:45AM