Validation of Tsunami Design Guidelines for Coastal Bridges

The objective of this study is to develop bridge design guidelines for the estimation of tsunami loads on highway bridges. It is proposed that the work include verification of the guidelines by model testing or comparison with observed results to calibrate the predictive capability of numerical models for analysis of tsunami loads on coastal bridges. Generalized bathymetry and topography parameters will be modeled analytically and replicated experimentally. For example, options may include a shallow submarine shelf case or deep submarine trench as bathymetry and coastal plain or river valley as topography. The resulting data will be analyzed to determine their appropriateness and compared against the numerical predictions.

Language

  • English

Project

  • Status: Active
  • Funding: $535000
  • Contract Numbers:

    TPF-5(307)

  • Sponsor Organizations:

    Hawaii Department of Transportation

    2530 Likelike Highway
    Honolulu, HI  United States  96817

    Washington State Department of Transportation

    Transportation Building
    Olympia, WA  United States  98504

    Oregon Department of Transportation

    555 13th Street NE
    Salem, OR  United States  97301

    California Department of Transportation

    1120 N Street
    Sacramento, CA  United States  95814

    Alaska Department of Transportation and Public Facilities

    Research & Technology Transfer
    2301 Peger Road
    Fairbanks, AK  United States  99709-5399

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Project Managers:

    Lazarus, Jon

  • Performing Organizations:

    Pacific Earthquake Engineering Research Center

    UC Berkeley
    325 Davis Hall
    Berkeley, CA  United States 

    Oregon State University, Corvallis

    101 Kearney Hall
    Corvallis, OR  United States  97331
  • Principal Investigators:

    Lynett, Patrick

  • Start Date: 20150416
  • Expected Completion Date: 20181130
  • Actual Completion Date: 0
  • Source Data: RiP Project 42288

Subject/Index Terms

Filing Info

  • Accession Number: 01566816
  • Record Type: Research project
  • Source Agency: Federal Highway Administration
  • Contract Numbers: TPF-5(307)
  • Files: RiP, USDOT
  • Created Date: Jun 23 2015 1:01AM