Advanced Analysis, Validation and Optimization of Virtual Cement and Concrete Testing

The research project will utilize materials that have been previously studies (to verify the validity of the VCCTL software), as well as materials specific to Florida, and materials used in Florida Department of Transportation (FDOT) specified mixture designs. The proposed research will investigate the use of the VCCTL software with respect to the analysis and prediction of behavior of cementitious concrete materials. The main objective is, using VCCTL, to develop methods, precision, and limitations relating to intelligent portland cement concrete mix design, using raw materials typically used in FDOT mix designs.

    Language

    • English

    Project

    • Status: Active
    • Funding: $381877.00
    • Contract Numbers:

      BDV31 977-22

    • Sponsor Organizations:

      Florida Department of Transportation

      Research Center
      605 Suwannee Street MS-30
      Tallahassee, FL  United States  32399-0450
    • Project Managers:

      DeFord, Harvey

    • Performing Organizations:

      University of Florida Research Foundation, Incorporated

      345 Weil Hall
      Gainesville, FL  United States  32611-2083
    • Principal Investigators:

      Ferraro, Christopher

    • Start Date: 20140408
    • Expected Completion Date: 0
    • Actual Completion Date: 20170430
    • Source Data: RiP Project 36356

    Subject/Index Terms

    Filing Info

    • Accession Number: 01521841
    • Record Type: Research project
    • Source Agency: Florida Department of Transportation
    • Contract Numbers: BDV31 977-22
    • Files: RiP, STATEDOT
    • Created Date: Apr 9 2014 1:00AM