Partnership to Develop an Integrated Advanced Travel Demand Model with Mode Choice Capability and Fine-Grained, Time-Sensitive Networks

The goal of Project C10 is to improve modeling and network processes and procedures in order to address policy and investment questions described in the Project Background that cannot be well addressed now, and to facilitate further development,The project intends to achieve this goal in partnership with a public agency that has responsibility for transportation modeling. All proposals must include a public agency partner. The primary objective of this project is to make operational in two public agencies adynamic integrated model-an integrated, advanced travel-demand model with a fine-grained, time-dependent network (integrated activities and networks). If this objective is not achieved, neither the project goal nor the secondary objectives can be achieved. The secondary objectives of this project are: (1) Produce a portable, transferrable, product, process, and sample data set that can be adapted for use elsewhere or used for research. (2) Incorporate SHRP 2 Capacity products from projects C04 (pricing) and C05 (operations) into the model capabilities. (3) Incorporate travel time reliability into the modeling capabilities. (4) Demonstrate the application of outputs of the integrated model to estimate greenhouse gas emissions using EPA's MOVES Model. (5) Demonstrate the dynamic integrated model set in a real-world environment on selected policies listed in this RFP.


  • English


  • Status: Completed
  • Contract Numbers:

    Project C10(B)

  • Sponsor Organizations:

    Strategic Highway Research Program 2

    Transportation Research Board
    500 Fifth Street, NW
    Washington, DC    20001
  • Project Managers:

    Andrle, Stephen

  • Performing Organizations:

    Cambridge Systematics

    555 12th Street
    Suite 1600
    Oakland, CA  United States  94607
  • Principal Investigators:

    Rossi, Thomas

  • Start Date: 20090901
  • Expected Completion Date: 0
  • Actual Completion Date: 20131231
  • Source Data: RiP Project 23632

Subject/Index Terms

Filing Info

  • Accession Number: 01461937
  • Record Type: Research project
  • Source Agency: Transportation Research Board
  • Contract Numbers: Project C10(B)
  • Files: TRB, RiP
  • Created Date: Jan 3 2013 1:55PM