Strong Motion Instrumentation Plan for UDOT Bridges: Array Design, Typical Details and Specifications

This project will develop a standard set of drawings and specifications for strong motion instrumentation; select and instrument representative Utah bridges; model the structure and subsurface to optimize placement of instruments; make a priori predictions of earthquake response; develop a plan for instrumentation of future highway bridges; and, develop a memorandum of understanding between the Utah Department of Transportation (UDOT) and the Advanced National Seismic System (ANSS). Utah currently has a network of strong motion instruments that have been deployed by the University of Utah Seismograph Station as part of the Advanced National Seismic System, the instrumentation plan for this research should become part of this network, pending coordination with ANSS.

    Language

    • English

    Project

    • Status: Active
    • Funding: $77407.00
    • Contract Numbers:

      5H05433H

      UT05.702

    • Sponsor Organizations:

      Utah Department of Transportation

      4501 South 2700 West
      Project Development
      Salt Lake City, UT  United States  84114-8380
    • Project Managers:

      Leonard, Blaine

    • Performing Organizations:

      Utah State University Transportation Center

      Utah State University
      Logan, UT  United States  84322-4110
    • Principal Investigators:

      Halling, Marvin

    • Start Date: 20060801
    • Expected Completion Date: 0
    • Actual Completion Date: 20090331
    • Source Data: RiP Project 12944

    Subject/Index Terms

    Filing Info

    • Accession Number: 01460439
    • Record Type: Research project
    • Source Agency: Utah State University Transportation Center
    • Contract Numbers: 5H05433H, UT05.702
    • Files: UTC, RIP, STATEDOT
    • Created Date: Jan 3 2013 1:25PM