Follow-on Investigation of Anchor Bolts/Bearings on the I-64 Ohio River Bridge at Louisville, KY

This is a follow-on study to an impromptu investigation of an anchor bolt failure on the downstream uplift bearing assembly at the north end of the cantilever truss (at Pier 4) on the I-64 (JFK) Bridge at Louisville.


    • English


    • Status: Active
    • Contract Numbers:

      KH 57

    • Sponsor Organizations:

      Kentucky Transportation Cabinet

      State Office Building, Clinton and High Streets
      Frankfort, KY  USA  40622
    • Project Managers:

      Byrd, Jamie

    • Performing Organizations:

      University of Kentucky, Lexington

      Kentucky Transportation Center
      College of Engineering, 176 Raymond Building
      Lexington, KY  USA  40506-0281
    • Principal Investigators:

      Hopwood, Ted

    • Start Date: 20070401
    • Actual Completion Date: 20071215
    • Source Data: RiP Project 14733

    Subject/Index Terms

    Filing Info

    • Accession Number: 01460219
    • Record Type: Research project
    • Source Agency: University of Kentucky, Lexington
    • Contract Numbers: KH 57
    • Files: RiP, STATEDOT
    • Created Date: Jan 3 2013 1:20PM