Warm Mix Asphalt Field Study

The Alabama Department of Transportation has planned the construction of a warm mix asphalt (WMA) test section near Birmingham, Alabama. Dunn Construction is the contractor for the project. The warm mix technology to be used is MeadWestvaco's Evotherm which is a WMA technology in the form of an asphalt emulsion containing a patented chemical formulation which enhances mix workability. MeadWestvaco and National Center for Asphalt Technology (NCAT) will review the mix design developed by Dunn Construction and make revisions as necessary for the WMA section. NCAT and its subcontractor will be present during the construction of the warm mix section and the control section to document the project, aid in problem solving, and conduct sampling and testing of the mixture.

    Language

    • English

    Project

    • Status: Completed
    • Funding: $109000.00
    • Contract Numbers:

      930-717

    • Sponsor Organizations:

      Alabama Department of Transportation

      1409 Coliseum Boulevard
      Montgomery, AL  United States  36130-3050
    • Project Managers:

      Lockett, Larry

    • Performing Organizations:

      Auburn University

      National Center for Asphalt Technology
      310 Sanford Hall
      Auburn, Alabama  United States  36849-5131
    • Principal Investigators:

      Kvasnak, Andrea

    • Start Date: 20070829
    • Expected Completion Date: 0
    • Actual Completion Date: 20081031
    • Source Data: RiP Project 14801

    Subject/Index Terms

    Filing Info

    • Accession Number: 01460200
    • Record Type: Research project
    • Source Agency: Alabama Department of Transportation
    • Contract Numbers: 930-717
    • Files: RIP, STATEDOT
    • Created Date: Jan 3 2013 1:20PM