Development of the FHWA Air Toxics Research Program

The deliverable product from Task A should be a short report summarizing the AT research that has been completed and which is currently in progress or planned. It should include an annotated bibliography summarizing the findings of each report reviewed. Also included in this task should be an initial set of recommended subject areas for future research based on the review of reports from past and current studies and from discussions with researchers involved in air toxics research. The report should be provided in both hardcopy and electronic format and it should be 508 compliant (See http://www.section508.gov/) so that it can be posted on the FHWA Environmental Website (see www.fhwa.dot.gov/environment). At the completion of this task, the contractor should arrange a meeting with FHWA to present both the written report and outline the findings and recommendations for future studies. The deliverable product from the second task is a list of at least 75 names that will be selected for the panel and the reason for their nomination. It should be provided in a very short report discussing the individuals considered, their background, and how they will be able to contribute to the development of the air toxics research strategy. The product from the third task will be recommendations for an AT research plan. The presentations and discussions that occur should be summarized by the contractor and provided to the FHWA along with recommendations for the research. These recommendations should include time and financial estimates for conducting the studies.

    Language

    • English

    Project

    • Status: Active
    • Contract Numbers:

      DTFH61-98-D-00105

    • Sponsor Organizations:

      Federal Highway Administration

      1200 New Jersey Avenue, SE
      Washington, DC  United States  20590
    • Project Managers:

      Black, Kevin

    • Performing Organizations:

      Louis Berger and Associates International, Incorporated

      1819 H Street, NW
      Washington, DC    20006-
    • Start Date: 20030414
    • Expected Completion Date: 0
    • Actual Completion Date: 20031010
    • Source Data: RiP Project 8044

    Subject/Index Terms

    Filing Info

    • Accession Number: 01459225
    • Record Type: Research project
    • Source Agency: Federal Highway Administration
    • Contract Numbers: DTFH61-98-D-00105
    • Files: RiP, USDOT
    • Created Date: Jan 3 2013 12:59PM