Evaluation of FRP Temporary Bypass Bridge
The performance evaluation will consist of both a laboratory and field component with most of the work focusing on the in-place performance. The lab testing will include controlled testing under simulated live loads. This testing will be completed to more fully understand the behavior of integrated FRP slab bridges.
Language
- English
Project
- Status: Active
-
Sponsor Organizations:
Iowa Department of Transportation
800 Lincoln Way
Ames, IA United States 50010 -
Performing Organizations:
Midwest Transportation Consortium
Iowa State University
Ames, IA United States 50010-8664 - Start Date: 20030901
- Expected Completion Date: 0
- Actual Completion Date: 0
- Source Data: RiP Project 10710
Subject/Index Terms
- TRT Terms: Bridges; Bypasses; Field studies; Laboratory studies; Live loads; Performance evaluations; Research projects; Slabs
- Geographic Terms: Iowa
- Subject Areas: Administration and Management; Bridges and other structures; Highways; Research; I30: Materials;
Filing Info
- Accession Number: 01458672
- Record Type: Research project
- Source Agency: Midwest Transportation Consortium
- Files: UTC, RiP, STATEDOT
- Created Date: Jan 3 2013 12:48PM