<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Research in Progress (RIP)</title>
    <link>https://rip.trb.org/</link>
    <atom:link href="https://rip.trb.org/common/TRIS Suite/feeds/RSS.aspx?s=PHNlYXJjaD48cGFyYW1zPjxwYXJhbSBuYW1lPSJkYXRlaW4iIHZhbHVlPSJhbGwiIC8%2BPHBhcmFtIG5hbWU9InN1YmplY3Rsb2dpYyIgdmFsdWU9Im9yIiAvPjxwYXJhbSBuYW1lPSJ0ZXJtc2xvZ2ljIiB2YWx1ZT0ib3IiIC8%2BPHBhcmFtIG5hbWU9ImxvY2F0aW9uIiB2YWx1ZT0iMTYiIC8%2BPC9wYXJhbXM%2BPGZpbHRlcnM%2BPGZpbHRlciBmaWVsZD0iaW5kZXh0ZXJtcyIgdmFsdWU9IiZxdW90O0RlcGFydG1lbnQgb2YgVHJhbnNwb3J0YXRpb24mcXVvdDsiIG9yaWdpbmFsX3ZhbHVlPSImcXVvdDtEZXBhcnRtZW50IG9mIFRyYW5zcG9ydGF0aW9uJnF1b3Q7IiAvPjwvZmlsdGVycz48cmFuZ2VzIC8%2BPHNvcnRzPjxzb3J0IGZpZWxkPSJwdWJsaXNoZWQiIG9yZGVyPSJkZXNjIiAvPjwvc29ydHM%2BPHBlcnNpc3RzPjxwZXJzaXN0IG5hbWU9InJhbmdldHlwZSIgdmFsdWU9InB1Ymxpc2hlZGRhdGUiIC8%2BPC9wZXJzaXN0cz48L3NlYXJjaD4%3D" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Research in Progress (RIP)</title>
      <url>https://rip.trb.org/Images/PageHeader-wTitle-RIP.jpg</url>
      <link>https://rip.trb.org/</link>
    </image>
    <item>
      <title>Leverage Traffic Speed Deflection Data for TxDOT Pavement Design</title>
      <link>https://rip.trb.org/View/2796540</link>
      <description><![CDATA[Each year, approximately 10 to 15 percent of the Texas highway network undergoes maintenance or rehabilitation. Pavement design depends on accurate characterization of pavement structural capacity. While falling weight deflectometer (FWD) testing is widely accepted for structural evaluation, its operation poses a safety hazard and limits its practical use to project-level. Advances in Traffic Speed Deflectometer (TSD) technology enable continuous, traffic-speed assessment of pavement deflection, providing unprecedented spatial coverage. However, TSD measurements are not currently incorporated into the Texas Department of Transportation's (TxDOT) pavement design and evaluation procedures. There is a need to develop methodologies to fully leverage TSD data for pavement design. The overall goal of this project is to integrate TSD data into TxDOT's pavement evaluation and design framework, thereby enhancing data-driven design and decision-making.]]></description>
      <pubDate>Wed, 04 Nov 2026 15:20:49 GMT</pubDate>
      <guid>https://rip.trb.org/View/2796540</guid>
    </item>
    <item>
      <title>Pavement Condition Forecasting Models
</title>
      <link>https://rip.trb.org/View/2793702</link>
      <description><![CDATA[The ability to predict pavement deterioration and forecast future pavement condition is highly valuable in supporting pavement management decisions and is a necessary component of the Ohio Department of Transportation's (ODOT) Pavement Management System (PMS). The PMS relies on the forecasting to accurately predict future conditions and recommend the most cost-effective timing and treatment type to maintain ODOT's pavement network. ODOT measures pavement condition using the Pavement Condition Rating (PCR) system. PCR consists of multiple distresses for each pavement type (jointed concrete, flexible, and composite) with a distress weight, severity, and extent. ODOT currently uses Markov transition probability matrixes and regression models to forecast future pavement conditions. The PMS uses the models to predict the distress deduct value for each distress and uses them in the decision tree logic. ODOT no longer has the ability to generate updated models. The development of updated models and the tool to generate them will allow ODOT to maintain its robust PMS. 


The goal of this research is to generate updated pavement condition forecast models and develop a tool that allows ODOT to update and maintain pavement forecast models over time.              ]]></description>
      <pubDate>Wed, 28 Oct 2026 14:35:16 GMT</pubDate>
      <guid>https://rip.trb.org/View/2793702</guid>
    </item>
    <item>
      <title>Research Technology Transfer - Research on Call (ROC) FY2027-2029</title>
      <link>https://rip.trb.org/View/2789942</link>
      <description><![CDATA[Ohio Department of Transportation's (ODOT's) Statewide Planning & Research - Part B Program (a.k.a., Research Program) contracts projects that evaluate, analyze, and develop recommendations on process improvements, policy enhancements, specification updates and the appropriate incorporation of best practices and new technologies. According to 23 CFR 420.203, technology transfer is: "those activities that lead to the adoption of a new technique or product by users and involves dissemination, demonstration, training, and other activities that lead to eventual innovation." It is ODOT's desire to present research studies in a user-friendly format and to distribute them to as wide an audience of potential users as practical. Effective messaging of research may assist in the acceptance and eventual implementation of findings. It is also essential to share information about the research program in general. For technology transfer to be effective, a variety of activities or mechanisms should be established. Examples include but are not limited to reports, fact sheets, flyers, workshops, webinars, website content, videos, articles, presentations, posters, newsletters, training, defining and highlighting significant impacts of the program, and educating stakeholders on the value research provides. Another important aspect of research is assisting in the advancement of technology to help ODOT to be more efficient and effective. Identifying innovative solutions to address issues related to data management, data analytics, artificial intelligence, and machine learning, or identifying software and tools that can generate value and streamline workflow is imperative. ODOT technical staff may not be able to fully vet potential available alternatives due to resources, availability, and expertise. Due to the sporadic and sometimes time-sensitive nature of technology transfer activities, it is possible that opportunities to share information and capture return-on-investment are missed. To address this issue, ODOT developed the Research-On-Call (ROC) program. The ROC is designed to provide direct, quick access to researchers in specific areas of expertise to conduct short-term, focused, urgent research tasks. This ROC will focus on tasks associated with research technology transfer and advancement.


]]></description>
      <pubDate>Fri, 16 Oct 2026 14:11:03 GMT</pubDate>
      <guid>https://rip.trb.org/View/2789942</guid>
    </item>
    <item>
      <title>Geotechnical Design Manual</title>
      <link>https://rip.trb.org/View/2789637</link>
      <description><![CDATA[The objective of this research project is to create a Geotechnical Design Manual that documents the current processes utilized by the Louisiana Department of Transportation and Development (LADOTD) Section 67, Geotechnical Design Group with explanation, hyperlinks and references to the supporting policy, design methodology, test procedures, and project development, coordination, and management.  The manual will include at least the following topics:  Table of Contents; Project Coordination Process; Consultant Services and Review; Subsurface Investigation Guidelines; Field and Laboratory Testing Procedures; Material Description-Classification-Logging; Geo Mechanics; Geotechnical load factor and resistance design (LFRD) Design; Geotechnical Resistance Factors; Geotechnical Performance Limits; LA Geology Seismicity; Shallow Foundations; Deep Foundations; Embankments; Earth Retaining Structures; Ground Improvement; Geosynthetic Design; Geotechnical Reports; Plan Preparation; Specifications and Special Provisions; Construction quality assurance/quality control (QA/QC); Construction Monitoring and Instrumentation; Geotechnical Software; Geotechnical Design Section Forms; mechanically stabilized earth (MSE) Walls; Reinforced Soil Slopes; Geotechnical Template Plans; and Project Specifications.
]]></description>
      <pubDate>Mon, 12 Oct 2026 15:38:38 GMT</pubDate>
      <guid>https://rip.trb.org/View/2789637</guid>
    </item>
    <item>
      <title>SPR-5114:  Statistical Analysis of Historical Unit Prices for INDOT Change Orders
</title>
      <link>https://rip.trb.org/View/2789519</link>
      <description><![CDATA[Indiana Department of Transportation's (INDOT's) change order (CO) unit price review currently relies on fixed-range thresholds that might rely on a limited number of variables such as project size, item quantity, and district. The proposed research will (a) identify statistical trends and patterns of historical CO unit prices and (b) develop a data-driven model for providing reasonable estimates of unit prices, based on the identified CO variables. This is expected to reduce the occurrence and severity of price under- or over-estimation incidents in the CO management process.]]></description>
      <pubDate>Mon, 12 Oct 2026 08:51:37 GMT</pubDate>
      <guid>https://rip.trb.org/View/2789519</guid>
    </item>
    <item>
      <title>2508 Bridge Deck Evaluation</title>
      <link>https://rip.trb.org/View/2786854</link>
      <description><![CDATA[The overall goal of this project is to develop an integrated, multimodal bridge deck evaluation framework using existing statewide Performance Monitoring System (PMS) datasets collected annually by Oklahoma Department of Transportation, including high-resolution 2D pavement imagery, 3D surface range data, roadway longitudinal profile data, and right-of-way front-view and rear-view imagery. The proposed framework is intended to serve as a screening, prioritization, and decision-support tool that improves bridge inspection efficiency, enhances statewide bridge condition awareness, and supports more proactive bridge preservation and asset management practices. Unlike conventional pavement condition assessment, bridge-specific deterioration features including deck cracking, spalling, scaling, potholes, joint deterioration, and approach slab surface irregularities require bridge-oriented analytical methodologies and engineering interpretation approaches.]]></description>
      <pubDate>Thu, 08 Oct 2026 14:21:54 GMT</pubDate>
      <guid>https://rip.trb.org/View/2786854</guid>
    </item>
    <item>
      <title>Division of Engineering Researcher on Call (ROC) FY2027-2029</title>
      <link>https://rip.trb.org/View/2786779</link>
      <description><![CDATA[The Ohio Department of Transportation (ODOT) is charged with the management and maintenance of Ohio's vast transportation system.  ODOT strives to execute this charge in the most effective and efficient manner possible.  At times, ODOT encounters situations where low-cost, short-term, focused research tasks are needed to address an urgent issue.  While important and potentially impactful, these research tasks do not warrant the level of a full-scale research project.  Due to the time-sensitive nature of these tasks, it is possible that some of these tasks go unmet because the standard contracting process requires more time than available.  To address this issue, ODOT developed the Research-On-Call (ROC) program.  The ROC is designed to provide direct, quick access to researchers in specific areas of expertise to conduct short-term, focused, urgent research tasks.  This ROC will focus on tasks from the Division of Engineering.                      ]]></description>
      <pubDate>Wed, 07 Oct 2026 14:08:05 GMT</pubDate>
      <guid>https://rip.trb.org/View/2786779</guid>
    </item>
    <item>
      <title>Division of Operations Researcher on Call (ROC)  FY2027-2029</title>
      <link>https://rip.trb.org/View/2786775</link>
      <description><![CDATA[The Ohio Department of Transportation (ODOT) is charged with the management and maintenance of Ohio's vast transportation system.  ODOT strives to execute this charge in the most effective and efficient manner possible.  At times, ODOT encounters situations where low-cost, short-term, focused research tasks are needed to address an urgent issue.  While important and potentially impactful, these research tasks do not warrant the level of a full-scale research project.  Due to the time-sensitive nature of these tasks, it is possible that some of these tasks go unmet because the standard contracting process requires more time than available.  To address this issue, ODOT developed the Research-On-Call (ROC) program.  The ROC is designed to provide direct, quick access to researchers in specific areas of expertise to conduct short-term, focused, urgent research tasks.  This ROC will focus on tasks from the Division of Operations.     ]]></description>
      <pubDate>Wed, 07 Oct 2026 10:37:53 GMT</pubDate>
      <guid>https://rip.trb.org/View/2786775</guid>
    </item>
    <item>
      <title>AI Applications for Developing Contractors Prequalification Criteria and Safety Matrix for NCDOT</title>
      <link>https://rip.trb.org/View/2784615</link>
      <description><![CDATA[Different state DOTs have attempted to use safety leading indicators for heavy construction projects. The North Carolina Department of Transportation (NCDOT) has contractors’ prequalification guidelines and a formal process for constructability review meetings. However, the safety component is not much considered, which may result in disruption of construction activities due to potential site safety violations. The current prequalification process for contractors requires multiple changes to improve the contractors’ selection process and secure a safe job site. Prequalification process may be revised to incorporate a safety scoring system that considers the contractors history, Occupational Safety and Health Administration (OSHA) citations, availability of in-house safety plans and safety audits, availability of competent persons and OSHA trainers, and formal safety training attended by the contractor’s company personnel. Similarly, NCDOT formal CR meeting needs to incorporate a safety matrix to be revised by project stakeholders during the meeting. The safety matrix should tie different site activities – listed in NCDOT standard bid template – with the respective OSHA big four construction hazard. Performance-based contractor prequalification allows NCDOT personnel to evaluate contractors past performance on similar work to ensure high-quality work in future projects. Occupational safety and health criteria are somehow included in such prequalification to limit construction site accidents and violations. However, current matrix/safety prequalification criteria have significant shortfalls. In this proposed research (implementation plan), the project research team will focus on utilizing artificial intelligence (AI) and machine learning (ML) applications to decide on the attributes relevant to job site safety and the most important parameters to be used in contractors’ prequalification procedures. The research tasks will use the developed criteria through the current project phase, collect information from NCDOT, other state DOTs, and OSHA to train a machine learning model to be developed specifically to evaluate the correlation between different attributes and possible “future” performance of the contractor. Attributes include – but not limited to – contractor’s size, budget, safety practices, previous experience, employee turnover, OSHA records, and experience modification rating. Predictive analytics will provide NCDOT personnel with proper algorithm to assess/predict possible contractor’s performance. The outcomes of this research will result in seamless flow of construction site activities, reduced accidents, and avoiding arbitration and litigation. ]]></description>
      <pubDate>Wed, 30 Sep 2026 11:09:05 GMT</pubDate>
      <guid>https://rip.trb.org/View/2784615</guid>
    </item>
    <item>
      <title>AI Agent-Based Decision Support System for Cross-Division Coordination at NCDOT</title>
      <link>https://rip.trb.org/View/2784611</link>
      <description><![CDATA[The North Carolina Department of Transportation (NCDOT) manages large amounts of project, planning, and operational information across multiple divisions. However, communication and coordination between divisions can be slow and fragmented because information is distributed across documents, systems, and personnel. This project proposes the development of an artificial intelligence (AI)-enabled decision support system to improve coordination and help decision makers make better, faster, and more informed decisions across divisions. As a pilot study, the project will focus on three NCDOT divisions. For each division, a dedicated AI-enabled assistant will be developed using publicly available or shareable documents, reports, schedules, maps, and planning data related to that division. These assistants will primarily function as accessible knowledge and communication tools that institute personnel and stakeholders from outside the division can interact with to quickly retrieve relevant information, understand division-specific processes, and accelerate the flow of information needed for coordinated decision-making. The system will support two levels of interaction. (1) Human-to-Agent Communication (implementation): Staff and decision makers can interact directly with division-specific AI assistants to quickly obtain information, summarize documents, identify relevant contacts or resources, and improve coordination between divisions and stakeholders. (2) Agent-to-Agent Communication (feasibility exploration): As the system evolves, AI assistants from different divisions will be able to communicate with one another to share relevant information, identify conflicts or overlaps, and support more coordinated cross-division planning and decision-making. The goal is not to replace human decision-making, but to improve information flow, reduce communication barriers, and create a more connected and intelligent decision-support environment across divisions. The study will evaluate the feasibility, usefulness, and potential benefits of AI enabled coordination tools in supporting collaboration, communication, and strategic decision making within transportation infrastructure programs. ​]]></description>
      <pubDate>Wed, 30 Sep 2026 10:53:43 GMT</pubDate>
      <guid>https://rip.trb.org/View/2784611</guid>
    </item>
    <item>
      <title>NCDOT Research Reels</title>
      <link>https://rip.trb.org/View/2781152</link>
      <description><![CDATA[ 
Telling the story of how the North Carolina Department of Transportation’s (NCDOT’s) research projects have been 
implemented, and how they can be further implemented across the state and by other peer states, is imperative. In 
early 2024, the UNC Highway Safety Research Center (HSRC) began working with NCDOT’s Research and 
Development Office to produce videos showcasing transportation research funded by NCDOT and conducted at 
North Carolina universities. The aim of this video project was to showcase how NCDOT research products can be 
used and implemented by communities across the state. The videos are also intended to highlight the benefits of 
transportation research and how it makes North Carolina’s transportation system safer and more efficient. During 
the course of the project, HSRC produced five videos, and completed partial work on two more, covering a range of 
North Carolina transportation research areas.  ]]></description>
      <pubDate>Tue, 29 Sep 2026 16:33:03 GMT</pubDate>
      <guid>https://rip.trb.org/View/2781152</guid>
    </item>
    <item>
      <title>Applied Generative AI Pilot: Establishing the Rapid Applied Research Environment (RARE) for Construction &amp; Materials
</title>
      <link>https://rip.trb.org/View/2780490</link>
      <description><![CDATA[This project will establish the Rapid Applied Research Environment (RARE), an internal generative AI capability designed to help the Idaho Transportation Department (ITD) address complex transportation challenges through applied artificial intelligence (AI) research. The project will use the Expert AI Co Research framework to develop and evaluate AI solutions for Construction and Materials challenges, including specification modernization, data extraction, technical research, and historical data recovery. The results will be used to measure efficiency improvements, evaluate the feasibility of AI tools, and develop a repeatable framework for using AI in future ITD research and operations.]]></description>
      <pubDate>Mon, 21 Sep 2026 16:09:10 GMT</pubDate>
      <guid>https://rip.trb.org/View/2780490</guid>
    </item>
    <item>
      <title>Freeway Management System Modernization</title>
      <link>https://rip.trb.org/View/2780410</link>
      <description><![CDATA[To address the issues noted above, this research proposes the following objectives: 
(1) Develop a full state of the practice of current approaches to freeway system management, including a literature review, market scan of PBD and non-intrusive detection devices, and a survey of freeway management organizations with select follow-up interviews to provide the research team with an understanding of what is currently available on the market, the capabilities as well as advantages and disadvantages of various devices and SaaS products, and insight into how other agencies with similar responsibilities are navigating these same waters. (2) Conduct a Multi-Criteria Decision Analysis (MCDA), an approach used to assist rational decision making between various options when there are conflicting objectives including situations where criteria cannot be directly compared and there are multiple stakeholder objectives that may be in conflict with each other, to drive the content contained in a migration roadmap to assist Arizona Department of Transportation (ADOT) in moving from current practice to the integration of PBD and non-intrusive sensor data into its Freeway Management System (FMS). (3) Create a migration roadmap for ADOT to use as it moves forward with next generation sensor integration. This roadmap will include outcomes to be expected by various stakeholders from various levels of investment at different time horizons.]]></description>
      <pubDate>Fri, 18 Sep 2026 17:18:58 GMT</pubDate>
      <guid>https://rip.trb.org/View/2780410</guid>
    </item>
    <item>
      <title>Enterprise GIS &amp; Data Hub for Integrated Planning and Safety in Arizona</title>
      <link>https://rip.trb.org/View/2780409</link>
      <description><![CDATA[Arizona Department of Transportation (ADOT) has invested in foundational geospatial assets — the Linear Referencing System (LRS), the Roadway Characteristics Inventory (RCI), and the AZGeo Data Hub — but they remain fragmented across planning, safety, and operations, and the data flowing between them is assembled through ad hoc requests rather than governed pipelines. At the same time, federal expectations now require state DOTs to maintain authoritative, standardized, and shareable geospatial data: ARNOLD (All Roads Network Of Linear referenced Data), MIRE/FDE (Model Inventory of Roadway Elements / Fundamental Data Elements), and WZDx (Work Zone Data Exchange). The gap between fragmented assets and federal-grade pipelines is what prevents ADOT from turning raw data streams — work zones, signals, sensors, and connected-vehicle (CV) feeds — into actionable planning and safety insight. This project addresses both dimensions. Externally, it establishes a unified Enterprise Geographic Information Systems (GIS) architecture with governed, automated pipelines fulfilling federal standards (ARNOLD, MIRE/FDE, WZDx), eliminating the manual assembly that delays federal submissions. Internally, it delivers self-service dashboards giving ADOT planners and safety engineers direct access to integrated, analysis-ready data. Intended users: ADOT’s Roadway Inventory & GIS unit (federal reporting), planners (corridor performance, project scoping), safety engineers (roadway, intersection, back-of-queue safety), and asset managers (governance, provenance). The work delivers an enterprise architecture, governed pipelines, dashboards, a governance framework, and validated corridor case studies.]]></description>
      <pubDate>Fri, 18 Sep 2026 17:15:16 GMT</pubDate>
      <guid>https://rip.trb.org/View/2780409</guid>
    </item>
    <item>
      <title>Advancing Pavement Design Inputs Through Improved R-Value Predictions</title>
      <link>https://rip.trb.org/View/2780407</link>
      <description><![CDATA[The objective of this research is to develop improved R-value prediction equations that enhance accuracy while remaining practical for Arizona Department of Transportation (ADOT) pavement design use. To achieve this objective, the project will: 
(1) Collect and compile available ADOT soil and R-value datasets from different Arizona regions, including measured R-values, soil classification, index properties, gradation data, project location, material source, and other routinely available laboratory or field information. (2) Perform regression and statistical analyses to evaluate the accuracy of the current ADOT R-value correlation and identify soil parameters that can improve prediction performance for Arizona materials. (3) Develop and validate enhanced R-value prediction equations using practical input parameters such as PI, percent passing the No. 200 sieve, gradation indices, USCS classification, and regional soil information where appropriate.
(4) Provide implementation recommendations for ADOT, including recommended equations, input requirements, limitations, example calculations, and a simple calculation tool for use by Pavement Design and Geotechnical staff.]]></description>
      <pubDate>Fri, 18 Sep 2026 17:07:19 GMT</pubDate>
      <guid>https://rip.trb.org/View/2780407</guid>
    </item>