Crash Analysis at Intersections with Transit Signal Priority

Transit Signal Priority (TSP) systems are widely used to improve transit operations at signalized intersections, but variations in signal display design may affect how drivers interpret and respond to these signals. Although recent updates to the Manual on Uniform Traffic Control Devices (MUTCD) revised standards for certain TSP indications, many jurisdictions continue to operate legacy signal designs. The safety implications of these design differences are not well understood. This project investigates the relationship between TSP signal display configurations and crash outcomes at intersections. The research will develop a national inventory of TSP implementation sites and associated signal design characteristics, compile crash histories for these locations, and analyze crash frequency and severity using statistical modeling. Crash report narratives will also be reviewed to identify behavioral factors linked to specific signal displays. Results will provide evidence-based guidance on transit signal design and support future updates to national standards, improving intersection safety while maintaining effective transit operations.

Language

  • English

Project

  • Status: Active
  • Funding: $100,000.00
  • Contract Numbers:

    69A3552348301

  • Sponsor Organizations:

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    University of Massachusetts, Amherst

    Department of Civil and Environmental Engineering
    130 Natural Resources Road
    Amherst, MA  United States  01003
  • Performing Organizations:

    University of Massachusetts, Amherst

    Department of Civil and Environmental Engineering
    130 Natural Resources Road
    Amherst, MA  United States  01003
  • Principal Investigators:

    Christofa, Eleni

    Knodler, Michael

    Tainter, Francis

  • Start Date: 20260101
  • Expected Completion Date: 20261231
  • Actual Completion Date: 0
  • USDOT Program: University Transportation Centers Program
  • Subprogram: University Transportation Centers

Subject/Index Terms

Filing Info

  • Accession Number: 01974410
  • Record Type: Research project
  • Source Agency: New England University Transportation Center
  • Contract Numbers: 69A3552348301
  • Files: UTC, RIP
  • Created Date: Dec 18 2025 2:02PM