Shear Wave Velocity Measurements - Phase II
The objective of this project is to update and refine the Missouri Department of Transportation (MoDOT)’s geotechnical seismic site investigation and analysis procedures in response to the release of the American Association of State Highway and Transportation Officials (AASHTO) Guide Specifications for Load and Resistance Factor Design (LRFD) Seismic Bridge Design, 3rd Edition. This will also include updates for geotechnical investigations procedures, analysis methods, and global stability procedures for retaining wall and embankment design in response to AASHTO LRFD Bridge Design Specifications, 10th Edition. The project will include an evaluation of available software programs that may assist in performing the required seismic analysis as it relates to transportation projects, including but not limited to bridges, culverts, retaining walls, and roadway embankments. The conclusions and results of the analysis will be incorporated into the existing Engineering Policy Guide (EPG). Additionally, at the conclusion of the project, MoDOT staff will be trained on the preferred methods of performing the updated seismic hazard analysis.
Language
- English
Project
- Status: Active
- Funding: $199,718.94
-
Contract Numbers:
TR202614
-
Sponsor Organizations:
Missouri Department of Transportation
1617 Missouri Boulevard
P.O. Box 270
Jefferson City, MO United States 65102 -
Project Managers:
Hosey, Jenni
-
Performing Organizations:
130 Point West Blvd.
St Charles, MO United States 63301 -
Principal Investigators:
Casey, Tom
- Start Date: 20250915
- Expected Completion Date: 20270701
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Bridge design; Culverts; Embankments and retaining walls; Load and resistance factor design; Retaining walls; S waves; Seismicity
- Identifier Terms: Missouri Department of Transportation
- Geographic Terms: Missouri
- Subject Areas: Bridges and other structures; Data and Information Technology; Education and Training; Geotechnology; Policy;
Filing Info
- Accession Number: 01974229
- Record Type: Research project
- Source Agency: Missouri Department of Transportation
- Contract Numbers: TR202614
- Files: RIP, STATEDOT
- Created Date: Dec 16 2025 9:39AM