Examining the Potential of Thermoplastic FRP Tapes Inside Highly Exothermic Overlays as a New Material for Rapid Bridge Deck Protection
Some scenarios for concrete bridge deck repair involve inadequate bond between overlay and bridge deck leading to various distresses, including slippage, delamination, longitudinal joints failure, fatigue cracking, and rutting. Inadequate bond does not allow the cross-section act as a single monolithic unit. This is detrimental to structural integrity and causes major problems associated with bridge deck failures. Detecting and repairing this damage is often costly and time-consuming due to the inaccessibility of the underlying concrete for direct inspection. To maintain durability over its design life, special attention should be given to the protection of bridge decks to prevent serious damage to the concrete and structural reinforcement. It is of vital importance to develop solutions and investigate alternatives that can not only improve adhesion between overlay and underlying concrete decks and maintain the necessary strength requirements but also reduce maintenance cost throughout its service lifetime.
Language
- English
Project
- Status: Active
- Funding: $65,000.00
-
Contract Numbers:
69A3552348322
-
Sponsor Organizations:
Innovative Bridge Technologies/Accelerated Bridge Construction University Transportation Center (IBT/ABC-UTC)
Florida International University
Miami, FL United StatesOffice of the Assistant Secretary for Research and Technology
University Transportation Centers Program
Department of Transportation
Washington, DC United States 20590 -
Performing Organizations:
University of Oklahoma, Norman
School of Civil Engineering and Environmental Science
202 West Boyd Street, Room 334
Norman, OK United States 73019 -
Principal Investigators:
Vemuganti, Shreya
- Start Date: 20250101
- Expected Completion Date: 0
- Actual Completion Date: 0
- USDOT Program: University Transportation Centers Program
Subject/Index Terms
- TRT Terms: Bridge decks; Concrete bridges; Fiber reinforced materials; Overlays (Pavements); Thermoplastic materials
- Subject Areas: Bridges and other structures; Highways; Maintenance and Preservation; Materials;
Filing Info
- Accession Number: 01973309
- Record Type: Research project
- Source Agency: Innovative Bridge Technologies/Accelerated Bridge Construction University Transportation Center (IBT/ABC-UTC)
- Contract Numbers: 69A3552348322
- Files: UTC, RIP
- Created Date: Dec 2 2025 4:11PM