Synthesis of Information Related to Highway Practices. Topic 57-14. Practices Related to Cost Estimating for Early Project Development Phases

Preliminary Scope: Most state departments of transportation (DOTs) develop early-stage cost estimates during planning and programming phases to support budgeting, project selection, and funding requests. These early estimates are typically developed using conceptual or parametric methods due to preliminary project scope and limited information about design development. Despite their widespread use, state DOTs vary significantly in how they perform, manage, and document these estimates. A 2025 national survey of over 30 state DOTs revealed wide differences in estimating tools, methodologies (e.g., parametric, bid-based), adjustment techniques for inflation and scope changes, and communication of estimate uncertainty. Many agencies reported low confidence in their parametric estimates, highlighting a need for improved data, training, and standardization. While recent research addresses model accuracy, construction cost indices, and stochastic estimation techniques, resources do not appear to document how state DOTs implement conceptual or parametric estimating practices. Understanding how these practices vary in data sources, staffing, estimation policies, and integration into decision-making is important for identifying potential gaps that could guide future research. The objective of this synthesis is to document current state DOT practices for developing, managing, and applying cost estimates during early project development phases, including estimation methods, tools, data sources, staffing responsibilities, adjustment techniques, and integration of early estimates into programming and decision-making processes. Information to be gathered includes (but is not limited to): (1) Types of methods used and procedures for preparing cost estimation projects; (2) Tools, systems, and sources of data used to develop estimates (e.g., Excel-based tools, AASHTOWare Estimator, or in-house models); (3) Staff and units responsible (and qualifications and skills required) for preparing conceptual and parametric estimates (e.g., planners, estimators, consultants); (4) Existing training programs or guidelines used to support staff responsible for early estimates; (5) Techniques used to account for inflation, regional cost variation, scope maturity, and market conditions; (6) Frequency and timing of estimate updates as projects advance through development stages; (7) Communication of early estimates within the agency or to external stakeholders; and (8) Practices for integrating early estimates into projects and tracking performance related to early estimates (e.g., comparison to plans, specifications, and estimates, or awarded bids). Information will be gathered through a literature review, a survey of state DOTs, and follow-up interviews with selected DOTs for the development of case examples. Information gaps and suggestions for research to address those gaps will be identified. Information sources (partial): (1) Rueda-Benavides, J., et al. 2020. NCHRP Web-Only Document 283: Improving Mid-Term, Intermediate, and Long-Range Cost Forecasting for State Transportation Agencies. Washington, DC: Transportation Research Board. https://doi.org/10.17226/25974. (2) Stochastic Conceptual Cost Estimating of Highway Projects to Communicate Uncertainty Using Bootstrap Sampling, ASCE-ASME Journal of Risk and Uncertainty, 2017. (3) Reducing Data-Collection Efforts for Conceptual Cost Estimating at a Highway Agency, Journal of Construction Engineering Management, 2016. (4) Blampied N. R. Parametric Functions for Conceptual and Feasibility Estimating in Public Highway Project Portfolios, University of California, Berkeley, 2018. (5) New Approach to Developing Conceptual Cost Estimates for Highway Projects, Journal of Construction Engineering and Management, 2011. (6) Develop an Improved SDDOT Construction Cost Index, Texas A&M TTI and South Dakota DOT, 2021. (7) Advanced Methodology to Determine Highway Construction Cost Index (HCCI), Montana DOT and FHWA, 2017. (8) Conceptual Cost Estimation of Highway Bid Items – A Systematic Literature Review, Engineering, Construction and Architectural Management, 2022. (9) AASHTO Practical Guide to Cost Estimating, AASHTO, 2013. (10) Synthesis of Practices and Tools for Cost Estimation and Cost Management for Transportation Projects. CIB Journal for the Advancement of Performance Information and Value. Vol. 13, Issue 1, pp. 22–6. (2021).

Language

  • English

Project

Subject/Index Terms

Filing Info

  • Accession Number: 01972838
  • Record Type: Research project
  • Source Agency: Transportation Research Board
  • Contract Numbers: Project 20-05, Topic 57-14
  • Files: TRB, RIP
  • Created Date: Nov 25 2025 4:09PM