Evaluate Thick Lift High Performance Grade (HPG) Mixes for Intersections, Border Checkpoints, and Other Locations with Slow Moving Heavy Traffic
Several Districts of the Texas Department of Transportation (TxDOT) recently reported rutting problems greater than 2 inches at intersections, border checkpoints, and other locations where heavy truck traffic either moves very slowly or is stationary while waiting in queues, even though the best mixes (e.g., stone matrix asphalt) were used. There is an urgent need to address such premature rutting problem in those places in a timely manner. The research team will identify and evaluate the suitable mixes and single lift construction technique to avoid premature rutting failures at those places, resulting in major cost savings and reducing wet weather accidents. The research team will review literature to identify the critical factors for improving mix rutting resistance. Based on the findings from the literature, the research team will develop and execute an experimental design to identify the suitable mixes for the slow-moving heavy traffic and then construct field trials with those mixes in a single thick lift and follow up their field performance. In the end, the research team will recommend specification changes and develop guidelines for constructing single thick lift with suitable mixes at intersections, border checking points, or other places.
Language
- English
Project
- Status: Active
- Funding: $778,204.00
-
Contract Numbers:
0-7250
-
Sponsor Organizations:
Texas Department of Transportation
125 E. 11th Street
Austin, TX United States 78701-2483 -
Managing Organizations:
Texas Department of Transportation
125 E. 11th Street
Austin, TX United States 78701-2483 -
Project Managers:
Kasberg, Katelyn
-
Performing Organizations:
Texas A&M Transportation Institute
Texas A&M University System
3135 TAMU
College Station, TX United States 77843-3135Center for Transportation Research
3925 W. Braker Lane
Austin, TX United States 78759 -
Principal Investigators:
Zhou, Fujie
- Start Date: 20260101
- Expected Completion Date: 20281231
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Asphalt mixtures; Heavy vehicles; Intersections; Mix design; Pavement distress; Pavement performance; Pavement ruts; Rutting; Truck traffic
- Geographic Terms: Texas
- Subject Areas: Construction; Design; Highways; Maintenance and Preservation; Materials; Pavements;
Filing Info
- Accession Number: 01967532
- Record Type: Research project
- Source Agency: Texas Department of Transportation
- Contract Numbers: 0-7250
- Files: RIP, STATEDOT
- Created Date: Sep 29 2025 4:16PM