The Downstream Infrastructure Impacts of Design Vehicle Selection

Selecting a single design vehicle can significantly influence roadway geometry, safety, and user experience. Many roadway designs default to the largest vehicle, under the assumption that this approach will inherently accommodate smaller vehicles and non-motorized users. Yet, larger design vehicles may encourage overbuilt infrastructure, leading to wide lanes, large turning radii, and lengthy pedestrian crossings—conditions that can raise vehicle speeds and reduce pedestrian safety. Conversely, opting for a vehicle that is too small can force larger vehicles to encroach upon adjacent lanes or curbs, increasing maintenance costs and crash risks. This project investigates how design vehicle choices affect roadway outcomes through two main phases. First, it reviews historical, current, and international practices via archival research, engineering manuals, policy documents, and interviews with practitioners. Second, it uses scenario modeling to measure how different vehicle assumptions alter intersection geometry, pedestrian crossings, and operational performance, as well as to evaluate the resulting safety and cost implications. The research will generate evidence-based guidelines for selecting an appropriate design vehicle, thereby optimizing roadway dimensions while safeguarding multimodal users. By clarifying the downstream impacts of over- or under-designing for specific vehicles, this study aims to improve safety and functionality, minimize unnecessary infrastructure expenses, and align with broader sustainability and equity goals.

Language

  • English

Project

  • Status: Active
  • Funding: $160,940.00
  • Contract Numbers:

    69A3552348308

  • Sponsor Organizations:

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    Center for Transformative Infrastructure Preservation and Sustainability

    North Dakota State University
    Fargo, North Dakota  United States  58108-6050
  • Project Managers:

    Tolliver, Denver

  • Performing Organizations:

    University of Colorado Denver

    Civil Engineering Department
    Denver, CO  United States  80204
  • Principal Investigators:

    Marshall, Wesley

    Misra, Aditi

  • Start Date: 20250521
  • Expected Completion Date: 20270520
  • Actual Completion Date: 0
  • USDOT Program: University Transportation Centers Program
  • Source Data: CTIPS-047

Subject/Index Terms

Filing Info

  • Accession Number: 01956416
  • Record Type: Research project
  • Source Agency: Center for Transformative Infrastructure Preservation and Sustainability
  • Contract Numbers: 69A3552348308
  • Files: UTC, RIP
  • Created Date: May 27 2025 4:11PM