The Downstream Infrastructure Impacts of Design Vehicle Selection
Selecting a single design vehicle can significantly influence roadway geometry, safety, and user experience. Many roadway designs default to the largest vehicle, under the assumption that this approach will inherently accommodate smaller vehicles and non-motorized users. Yet, larger design vehicles may encourage overbuilt infrastructure, leading to wide lanes, large turning radii, and lengthy pedestrian crossings—conditions that can raise vehicle speeds and reduce pedestrian safety. Conversely, opting for a vehicle that is too small can force larger vehicles to encroach upon adjacent lanes or curbs, increasing maintenance costs and crash risks. This project investigates how design vehicle choices affect roadway outcomes through two main phases. First, it reviews historical, current, and international practices via archival research, engineering manuals, policy documents, and interviews with practitioners. Second, it uses scenario modeling to measure how different vehicle assumptions alter intersection geometry, pedestrian crossings, and operational performance, as well as to evaluate the resulting safety and cost implications. The research will generate evidence-based guidelines for selecting an appropriate design vehicle, thereby optimizing roadway dimensions while safeguarding multimodal users. By clarifying the downstream impacts of over- or under-designing for specific vehicles, this study aims to improve safety and functionality, minimize unnecessary infrastructure expenses, and align with broader sustainability and equity goals.
Language
- English
Project
- Status: Active
- Funding: $160,940.00
-
Contract Numbers:
69A3552348308
-
Sponsor Organizations:
Office of the Assistant Secretary for Research and Technology
University Transportation Centers Program
Department of Transportation
Washington, DC United States 20590 -
Managing Organizations:
Center for Transformative Infrastructure Preservation and Sustainability
North Dakota State University
Fargo, North Dakota United States 58108-6050 -
Project Managers:
Tolliver, Denver
-
Performing Organizations:
Civil Engineering Department
Denver, CO United States 80204 -
Principal Investigators:
Marshall, Wesley
Misra, Aditi
- Start Date: 20250521
- Expected Completion Date: 20270520
- Actual Completion Date: 0
- USDOT Program: University Transportation Centers Program
- Source Data: CTIPS-047
Subject/Index Terms
- TRT Terms: Costs; Crosswalks; Design methods; Highway design; Highway operations; Intersections; Safety; Vehicle size; Vehicles
- Subject Areas: Design; Highways; Operations and Traffic Management; Pedestrians and Bicyclists; Safety and Human Factors;
Filing Info
- Accession Number: 01956416
- Record Type: Research project
- Source Agency: Center for Transformative Infrastructure Preservation and Sustainability
- Contract Numbers: 69A3552348308
- Files: UTC, RIP
- Created Date: May 27 2025 4:11PM