Mechanical Characterizations of Joints in Segmented Tunnel Liners Due to Flexural and Thrust Jack Loading (UTI-UTC 43)

This project investigates the mechanical behavior of joints in segmented tunnel liners subjected to flexural and thrust jack loading conditions commonly encountered during tunnel construction and operation. Utilizing both experimental testing and numerical modeling, the research aims to understand the load-deformation response and failure mechanisms at segment joints, particularly under combined loading scenarios. The study is based on data and specimen segments from the Chesapeake Bay Tunnel expansion, with testing conducted to evaluate performance under controlled thrust and bending loads. Analytical models are developed and calibrated to replicate observed behaviors, contributing to more accurate predictions of joint behavior. The outcomes of this project will inform the design and construction of more resilient and efficient segmental tunnel linings, supporting improved safety and performance in underground transportation infrastructure.

    Language

    • English

    Project

    • Status: Completed
    • Funding: $112,759.00
    • Contract Numbers:

      69A3551747118

    • Sponsor Organizations:

      University Transportation Center for Underground Transportation Infrastructure

      Colorado School of Mines
      Golden, CO  United States  80401

      Office of the Assistant Secretary for Research and Technology

      University Transportation Centers Program
      Department of Transportation
      Washington, DC  United States  20590
    • Managing Organizations:

      Colorado School of Mines

      1500 Illinois St
      Golden, CO  United States  80401

      Lehigh University

      ATLSS Engineering Research Center
      IMBT Laboratory
      Bethlehem, PA  United States  18015-4729
    • Performing Organizations:

      Lehigh University

      ATLSS Engineering Research Center
      IMBT Laboratory
      Bethlehem, PA  United States  18015-4729
    • Principal Investigators:

      Naito , Clay

      Quiel , Spencer

    • Start Date: 20201201
    • Expected Completion Date: 20230430
    • Actual Completion Date: 20230501
    • USDOT Program: University Transportation Centers

    Subject/Index Terms

    Filing Info

    • Accession Number: 01954445
    • Record Type: Research project
    • Source Agency: University Transportation Center for Underground Transportation Infrastructure
    • Contract Numbers: 69A3551747118
    • Files: UTC, RIP
    • Created Date: May 7 2025 3:59PM