Resilience and sustainability of underground transportation infrastructure (UTI-UTC 32)

This project evaluates and enhances the resilience and sustainability of underground transportation infrastructure (UTI) in the face of natural and man-made hazards. By applying existing climate vulnerability assessment tools—such as the FHWA’s Vulnerability Assessment Scoring Tool (VAST), Envision, and the Sustainable Infrastructure Resilience Framework (SIRF)—the research identifies risks and sustainability gaps across a range of underground facilities. The study incorporates system-level assessments, climate projections, and hazard exposure data to evaluate the long-term adaptability and robustness of tunnel systems. It also considers the environmental impact of construction materials and operational practices to support sustainable engineering solutions. The outcomes aim to inform future design and retrofit strategies that prioritize lifecycle performance, environmental stewardship, and community safety in underground transit networks.

    Language

    • English

    Project

    • Status: Completed
    • Funding: $11,276.00
    • Contract Numbers:

      69A3551747118

    • Sponsor Organizations:

      University Transportation Center for Underground Transportation Infrastructure

      Colorado School of Mines
      Golden, CO  United States  80401

      Office of the Assistant Secretary for Research and Technology

      University Transportation Centers Program
      Department of Transportation
      Washington, DC  United States  20590
    • Managing Organizations:

      Colorado School of Mines

      1500 Illinois St
      Golden, CO  United States  80401

      California State University, Los Angeles

      5151 State University Drive
      Los Angeles, California  United States  90032
    • Performing Organizations:

      California State University, Los Angeles

      5151 State University Drive
      Los Angeles, California  United States  90032
    • Principal Investigators:

      Rodriguez-Nikl, Tonatiuh

      Mazari, Mehran

    • Start Date: 20180401
    • Expected Completion Date: 20200501
    • Actual Completion Date: 20200501
    • USDOT Program: University Transportation Centers

    Subject/Index Terms

    Filing Info

    • Accession Number: 01954478
    • Record Type: Research project
    • Source Agency: University Transportation Center for Underground Transportation Infrastructure
    • Contract Numbers: 69A3551747118
    • Files: UTC, RIP
    • Created Date: May 7 2025 5:14PM