Mechanical Characterizations of Joints in Segmented Tunnel Liners Due to Flexural and Thrust Jack Loading (UTI-UTC 28)

This research investigates the structural behavior of joints in segmented tunnel liners subjected to flexural and thrust jack loading, which are critical conditions encountered during tunnel construction and operation. The project focuses on quantifying the mechanical response of these joints, particularly under load scenarios simulating bending moments and axial forces applied by tunnel boring machines (TBMs). Experimental testing is conducted on full-scale precast concrete segments, including those from the Chesapeake Bay Tunnel project, to assess parameters such as joint stiffness, rotational capacity, and load-bearing performance. The study is complemented by detailed numerical modeling and analytical evaluations to validate test results and improve segmental design methodologies. The outcomes are expected to inform design guidelines and enhance the durability, safety, and reliability of segmented tunnel systems used in modern underground transportation infrastructure.

    Language

    • English

    Project

    • Status: Completed
    • Funding: $56,379.00
    • Contract Numbers:

      69A3551747118

    • Sponsor Organizations:

      University Transportation Center for Underground Transportation Infrastructure

      Colorado School of Mines
      Golden, CO  United States  80401

      Office of the Assistant Secretary for Research and Technology

      University Transportation Centers Program
      Department of Transportation
      Washington, DC  United States  20590
    • Managing Organizations:

      Colorado School of Mines

      1500 Illinois St
      Golden, CO  United States  80401

      Lehigh University

      ATLSS Engineering Research Center
      IMBT Laboratory
      Bethlehem, PA  United States  18015-4729
    • Performing Organizations:

      Lehigh University

      ATLSS Engineering Research Center
      IMBT Laboratory
      Bethlehem, PA  United States  18015-4729
    • Principal Investigators:

      Naito , Clay

      Quiel , Spencer

    • Start Date: 20201101
    • Expected Completion Date: 20220430
    • Actual Completion Date: 20220501
    • USDOT Program: University Transportation Centers

    Subject/Index Terms

    Filing Info

    • Accession Number: 01954482
    • Record Type: Research project
    • Source Agency: University Transportation Center for Underground Transportation Infrastructure
    • Contract Numbers: 69A3551747118
    • Files: UTC, RIP
    • Created Date: May 7 2025 5:37PM