Accelerated Bridge Construction (ABC) Methods for Pile-Footing-Column Systems

Building on a previous project, the proposed research will advance the accelerated bridge construction method for bridge substructures using steel piles and precast pile caps and columns. The weight of the precast members will be reduced using hollow sections, which in turn will improve both construction tolerances and constructability. The hollow sections will be filled with in-situ concrete. The piles will be designed with temporary collars, which will eliminate the need to wait for the concrete to cure before continuing with the superstructure construction. The proposed research, funded jointly by the California Department of Transportation, will include a large-scale test unit which will incorporate both vertical and battered steel piles. The testing of the system will incorporate service level and extreme loads and ensure dependable performance of the new system and its components. As part of the testing program, the performance of the column and pile foundations will be examined systematically. Analytical models will be developed to realize the observed performance of the test unit and the components. Using the combination of analytical and experimental observations and findings from the previous phase of the project, appropriate design recommendations will be developed for improving bridge construction.

    Language

    • English

    Project

    • Status: Active
    • Funding: $140,010.00
    • Contract Numbers:

      TR-801

    • Sponsor Organizations:

      Iowa Department of Transportation

      800 Lincoln Way
      Ames, IA  United States  50010
    • Managing Organizations:

      Iowa Department of Transportation

      800 Lincoln Way
      Ames, IA  United States  50010
    • Project Managers:

      Goetz, Vanessa

    • Performing Organizations:

      Iowa State University, Ames

      Institute for Transportation
      2711 South Loop Drive, Suite 4700
      Ames, Iowa  United States  50010-8664
    • Principal Investigators:

      Ashlock, Jeramy

    • Start Date: 20211115
    • Expected Completion Date: 20231130
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01945646
    • Record Type: Research project
    • Source Agency: Iowa Department of Transportation
    • Contract Numbers: TR-801
    • Files: RIP, STATEDOT
    • Created Date: Feb 12 2025 6:34PM