Concrete Patching Methods

Many bridge decks and substructures on Kentucky Transportation Cabinet (KYTC)-managed structures are in dire need of rehabilitation. But a lot of the methods used to patch concrete result in poor performance, with failures in the new patching material and/or adjacent existing materials occurring not long after patches are completed. When failures happen, KYTC has to replace structural components, which comes at a greater cost. As such, the Cabinet needs guidance on materials and methods it can use to install concrete patches that are not vulnerable to rapid failure.

    Language

    • English

    Project

    • Status: Active
    • Funding: $260000
    • Contract Numbers:

      KYSPR-25-661

    • Sponsor Organizations:

      Kentucky Transportation Cabinet

      200 Mero Street
      Frankfort, KY  United States  40622
    • Performing Organizations:

      University of Kentucky, Lexington

      Kentucky Transportation Center College of Engineering, 176 Raymond Building
      Lexington, KY  United States  40506-0281
    • Principal Investigators:

      Gibson, Bryan

    • Start Date: 20240701
    • Expected Completion Date: 20260630
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01926967
    • Record Type: Research project
    • Source Agency: University of Kentucky, Lexington
    • Contract Numbers: KYSPR-25-661
    • Files: RIP, STATEDOT
    • Created Date: Aug 12 2024 1:26PM