Continuous decision plan for optimizing budget allocation for dredging projects considering shoaling effect within a multi-year horizon

Dredging is a constant operation to maintain the waterway shipping capacity along the rivers, coastal lines as well as ports and harbors. The goal is to achieve a maximum network capacity to support the regional and national economies within the range of a given budget. Shoaling happens after dredging to partially offset or undermine the dredging benefits. Wisely spending the dredging budget over the selected timeframe for a network capacity by considering the shoaling effect is the objective of this proposed research. This proposal assumes shoaling at each location/section follows a known probability distribution with a given draft. This project aims to improve the previous research by developing an innovative model for potentially systematically considering the route-based draft capacity after dredging. Previous models consider route-based minimum dredging instead. The multi-year decision making process shows compelling advantages over the continued, multiple, single-year, independent decisions. An important feature of the proposal is that it considers the first-year impacts on the remaining years. This project will specially consider interdependency of project effects on the network.

    Language

    • English

    Project

    • Status: Active
    • Funding: $180000
    • Contract Numbers:

      69A3552348331

    • Sponsor Organizations:

      Office of the Assistant Secretary for Research and Technology

      University Transportation Centers Program
      Department of Transportation
      Washington, DC  United States  20590
    • Managing Organizations:

      Maritime Transportation Research and Education Center (MarTREC)

      University of Arkansas
      4190 Bell Engineering Center
      Fayetteville, AR  United States  72701
    • Performing Organizations:

      Texas A&M University, College Station

      Texas A&M Engineering Experiment Station
      1470 William D. Fitch Parkway
      College Station, TX  United States  77845
    • Principal Investigators:

      Wang, Bruce

    • Start Date: 20240301
    • Expected Completion Date: 20260228
    • Actual Completion Date: 0
    • USDOT Program: University Transportation Centers

    Subject/Index Terms

    Filing Info

    • Accession Number: 01924914
    • Record Type: Research project
    • Source Agency: Maritime Transportation Research and Education Center (MarTREC)
    • Contract Numbers: 69A3552348331
    • Files: UTC, RIP
    • Created Date: Jul 23 2024 12:50PM