A Deep Dive Into Corridor DC Fast Chargers in California

As the US transportation sector shifts to battery electric vehicles (BEVs), a public network of reliable DC fast chargers has become increasingly essential to foster driver confidence in BEVs. This research will study the challenges of installation and operation of a reliable network of public DC fast charging stations. While existing studies show costs ranging from $20,000 - $150,000, the researchers find costs range anywhere between $122,000 and $440,000. Furthermore, this research will include a detailed methodology to measure station reliability based on charging infrastructure data. By assigning charging events to unique charging visits, the researchers can capture a holistic overview of the driver’s charging experience. The researchers' analysis of two different charging networks shows that users of these networks have an average chance of 83% and 77% of successful outcomes after one or more tries at a charging station. The researchers also find significant variation in station performance within the same network. The researchers will explore the level of reliability that is desirable in the context of drivers who are making long distance trips. A charging station located in a remote area with few options should prioritize achieving a higher reliability to ensure drivers can complete their trips. The researchers aim to study the spatial distribution of the charging network and model it’s resilience to meet different demand scenarios at different reliability metrics. Based on this model, the research will include mitigation strategies for CPOs and policymakers to employ to improve the reliability of the whole network.

Language

  • English

Project

  • Status: Active
  • Funding: $35000
  • Contract Numbers:

    DOT 69A3552348319

    DOT 69A3552344814

  • Sponsor Organizations:

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590

    National Center for Sustainable Transportation

    University of California, Davis
    Davis, CA  United States 

    University of California, Davis

    1 Shields Ave
    Davis, California  United States  95616
  • Managing Organizations:

    National Center for Sustainable Transportation

    University of California, Davis
    Davis, CA  United States 

    University of California, Davis

    1 Shields Ave
    Davis, California  United States  95616
  • Project Managers:

    Iacobucci, Lauren

  • Performing Organizations:

    National Center for Sustainable Transportation

    University of California, Davis
    Davis, CA  United States 

    University of California, Davis

    1 Shields Ave
    Davis, California  United States  95616
  • Principal Investigators:

    Gamage, Tisura

    Jenn, Alan

  • Start Date: 20240401
  • Expected Completion Date: 20250331
  • Actual Completion Date: 0
  • USDOT Program: University Transportation Centers

Subject/Index Terms

Filing Info

  • Accession Number: 01911825
  • Record Type: Research project
  • Source Agency: National Center for Sustainable Transportation
  • Contract Numbers: DOT 69A3552348319, DOT 69A3552344814
  • Files: UTC, RIP
  • Created Date: Mar 13 2024 5:46PM