Investigation of Unbraced Pile Height in Fully-Encased Pile Bents of Bridge Structures

A project recently completed for the Iowa Department of Transportation investigated the contributions of concrete encasements of steel H-piles used for bridges which have historically not been considered in the design process. The initial reason for the project was to determine the remaining capacity of a pile when subjected to scour, leaving bare the uncased portion of a pile. A tool was developed to calculate capacity and a subsequent laboratory investigation was completed to validate the pile capacity assessment tool. The study concluded the pile capacity is greater than what has been otherwise calculated. As a secondary result, consideration has been given to revising the capacity calculations of new piles especially in fully-encased pile bents. This project aims to identify the unbraced height limits of steel H-piles when fully-encased.

Language

  • English

Project

  • Status: Proposed
  • Funding: $SPR-RE23(008)-8H-00
  • Sponsor Organizations:

    Iowa Department of Transportation

    800 Lincoln Way
    Ames, IA  United States  50010
  • Managing Organizations:

    Iowa Department of Transportation

    800 Lincoln Way
    Ames, IA  United States  50010
  • Project Managers:

    Clute, Khyle

  • Performing Organizations:

    Iowa State University, Ames

    Center for Transportation Research and Education
    2711 South Loop Drive, Suite 4700
    Ames, IA  United States  50010-8664
  • Principal Investigators:

    Dahlberg, Justin

  • Start Date: 20221101
  • Expected Completion Date: 20240430
  • Actual Completion Date: 0

Subject/Index Terms

Filing Info

  • Accession Number: 01910172
  • Record Type: Research project
  • Source Agency: Iowa Department of Transportation
  • Files: RIP, STATEDOT
  • Created Date: Feb 27 2024 4:29PM