Develop Localized LRFD Procedure for Driven Piles with Dynamic Analysis for Georgia Bridge Foundations

The objective of the project is to develop a local Load and Resistance Factor Design (LRFD) procedure, including a table of locally calibrated resistance factors, for the driven piles designed and verified with dynamic analysis methods.

    Language

    • English

    Project

    • Status: Active
    • Funding: $389106
    • Contract Numbers:

      GDOT RP 23-13

    • Sponsor Organizations:

      Georgia Department of Transportation

      One Georgia Center
      600 West Peachtree Street, NW
      Atlanta, GA  United States  30308
    • Project Managers:

      Jordan, Kamari

    • Performing Organizations:

      Georgia Southern University

      1332 Southern Drive
      Statesboro, GA  United States  30458
    • Principal Investigators:

      Yang, Xiaoming

    • Start Date: 20240207
    • Expected Completion Date: 20270707
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01909020
    • Record Type: Research project
    • Source Agency: Georgia Department of Transportation
    • Contract Numbers: GDOT RP 23-13
    • Files: RIP, STATEDOT
    • Created Date: Feb 21 2024 8:03AM