SPR-4845: Investigate Existing Foundation Geotechnical Parameters and Compare These Strengths, Based on Current LRFD Codes
The project will create standardized procedures for reuse of existing bridge foundations that include two important components: (1) field investigation methods and (2) design procedures. Application of the procedures will result in more applications of foundation reuse, greater consistency among reuse projects, more efficient design processes, and substantial cost, time, and mobility savings associated with foundation reuse.
Language
- English
Project
- Status: Active
- Funding: $544809
-
Contract Numbers:
SPR-4845
-
Sponsor Organizations:
Purdue University/Indiana Department of Transportation JHRP
Purdue University
1284 Civil Engineering Building, Room 4154
West Lafayette, IN United States 47907-1284 -
Principal Investigators:
Loehr, Erik
Rosenblad, Brent
Boeckmann, Andrew
- Start Date: 20240101
- Expected Completion Date: 20270430
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Bridge design; Bridge foundations; Geotechnical engineering; Load and resistance factor design
- Subject Areas: Bridges and other structures; Design; Geotechnology; Highways;
Filing Info
- Accession Number: 01896539
- Record Type: Research project
- Source Agency: Indiana Department of Transportation
- Contract Numbers: SPR-4845
- Files: RIP, STATEDOT
- Created Date: Oct 18 2023 2:53PM