USF-CUTR I-4 FRAME Project "After" Study: Data Collection and Analysis of Safety and Mobility Conditions After Implementation
This research project will collect and analyze “after” data for applications allocated to USF-CUTR, perform a before-after study to evaluate impacts and improvements of the deployed I-4 FRAME applications, conduct an overall benefit-cost analysis for the I-4 FRAME project Connected Vehicle (CV) applications, perform satisfaction survey and analysis of I-4 FRAME CV Apps users, and document research findings and recommendations. The primary project objectives and efforts from the USF-CUTR team include the following: (1) complete “after” data collection for 10 selected I-4 FRAME applications allocated to USF-CUTR, addressing mobility challenges and benefit-cost analysis, and collect sample data during pre-deployment to minimize data gaps in the before-after data analysis; (2) evaluate impacts and improvements to mobility and safety from 10 selected applications via before-after studies; (3) address mobility challenges on I-4 FRAME project corridors; (4) perform an overall benefit-cost analysis for the 10 applications allocated to USF-CUTR; (5) conduct a satisfaction survey and analysis of I-4 FRAME users; and (6) document results of before-after studies, impact of I-4 FRAME application, benefit-cost analysis, user satisfaction survey, research findings, and recommendations.
Language
- English
Project
- Status: Active
- Funding: $344196
-
Contract Numbers:
BED25 977-15
-
Sponsor Organizations:
University of South Florida, Tampa
Department of Civil and Environmental Engineering
4202 E. Flowler Avenue, ENB 118
Tampa, FL United States 33620-5350 -
Managing Organizations:
Florida Department of Transportation
Research Center
605 Suwannee Street MS-30
Tallahassee, FL United States 32399-0450 -
Project Managers:
Wong, Edith
-
Performing Organizations:
University of South Florida, Tampa
Department of Civil and Environmental Engineering
4202 E. Flowler Avenue, ENB 118
Tampa, FL United States 33620-5350 -
Principal Investigators:
Lin, Pei-Sung
- Start Date: 20230417
- Expected Completion Date: 20270831
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Before and after studies; Benefit cost analysis; Connected vehicles; Intelligent transportation systems; Mobility; Transportation corridors
- Identifier Terms: Interstate 4
- Geographic Terms: Florida
- Subject Areas: Data and Information Technology; Highways; Operations and Traffic Management; Safety and Human Factors; Vehicles and Equipment;
Filing Info
- Accession Number: 01879339
- Record Type: Research project
- Source Agency: Florida Department of Transportation
- Contract Numbers: BED25 977-15
- Files: RIP, STATEDOT
- Created Date: Apr 17 2023 3:26PM