Calibrating Ground Response Analyses beneath an Instrumented Bridge Using the I-15 Borehole Array and Ground Motions from the Magna Earthquake

On March 18, 2020, a magnitude 5.7 earthquake struck the Salt Lake Valley near Magna, Utah. Important ground motions were recorded by a geotechnical borehole array installed near the intersection of I-15, I-80 and SR-201 in Salt Lake City. Borehole arrays play a key role in understanding seismic site response and in calibrating numerical ground response analyses (GRAs). This particular borehole array is even more valuable, as it lies in close proximity to a flyover bridge that is instrumented with 18 accelerometers that recorded structural response during the Magna earthquake. There is a need to study the ground motions recorded by the I-15 borehole array as a means to calibrate seismic GRAs that can inform numerical modeling at bridge sites throughout the Salt Lake Valley where shaking was not recorded. The overarching research objective of this proposal is to perform numerical 2D and 3D GRAs for the I-15 borehole array site using a large, site-specific 3D shear wave velocity model that will be developed from non-invasive methods. The GRAs will then be calibrated at small- to moderate-strains using the ground motions recorded by the borehole array throughout its lifetime and during the 2020 M5.7 Magna earthquake and its aftershocks.

Language

  • English

Project

  • Status: Active
  • Funding: $120000
  • Contract Numbers:

    69A3551747108

  • Sponsor Organizations:

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    Mountain-Plains Consortium

    North Dakota State University
    Fargo, ND  United States  58108
  • Project Managers:

    Tolliver, Denver

  • Performing Organizations:

    Civil & Environmental Engineering Department

    Utah State University
    Logan, UT  United States 
  • Principal Investigators:

    Cox, Brady

  • Start Date: 20221011
  • Expected Completion Date: 20240731
  • Actual Completion Date: 0
  • USDOT Program: University Transportation Centers Program
  • Source Data: MPC-694

Subject/Index Terms

Filing Info

  • Accession Number: 01861394
  • Record Type: Research project
  • Source Agency: Mountain-Plains Consortium
  • Contract Numbers: 69A3551747108
  • Files: UTC, RIP
  • Created Date: Oct 17 2022 9:31PM