Wireless Joint Monitoring for Large Movement Expansion Joints for Highway Bridge Resilience (1.23)
The primary objective of the proposed engineering project is to monitor a large movement expansion joint of a multi-span highway bridge using the developed real-time wireless sensor system from the previous project. This project will upgrade the current wireless joint monitoring system such that it can measure larger displacement in multiple locations to study the complex behavior of the expansion joints with multiple spans and skewness involved. The monitoring without the need for an inspection crew will reduce costs and inconvenience to the traveling public. Analysis of the data transmitted to the processing location will alert bridge engineers to potential problems well in advance, allowing preventive measures to be taken and expensive repair situations avoided and the safety and longevity of the bridge to be increased. The project consists of the following tasks: Task 1- Developing the upgraded sensor system for large movement joints; Task 2 - Field testing and data collection; Task 3 - Analysis of field data and assessment of the system.
- Record URL:
Language
- English
Project
- Status: Active
- Funding: $91463
-
Contract Numbers:
69A3551847101
-
Sponsor Organizations:
Office of the Assistant Secretary for Research and Technology
University Transportation Centers Program
Department of Transportation
Washington, DC United States 20590 -
Managing Organizations:
Transportation Infrastructure Durability Center
University of Maine
Orono, ME United States 04469Office of the Assistant Secretary for Research and Technology
University Transportation Centers Program
Department of Transportation
Washington, DC United States 20590 -
Project Managers:
Dunn, Denise
-
Performing Organizations:
Transportation Infrastructure Durability Center
University of Maine
Orono, ME United States 04469 Sponsored Programs Services
438 Whitney Road Ext 1133
Storrs, CT United States 06269-1133 -
Principal Investigators:
Jang, Shinae
Malla, Ramesh
Han, Song
- Start Date: 20231001
- Expected Completion Date: 20250630
- Actual Completion Date: 0
- USDOT Program: University Transportation Centers Program
Subject/Index Terms
- TRT Terms: Bridge construction; Data collection; Expansion joints; Monitoring; Wireless sensors
- Subject Areas: Bridges and other structures; Data and Information Technology; Highways; Maintenance and Preservation;
Filing Info
- Accession Number: 01851835
- Record Type: Research project
- Source Agency: Transportation Infrastructure Durability Center
- Contract Numbers: 69A3551847101
- Files: UTC, RIP
- Created Date: Jul 19 2022 9:24AM