Estimating the As-Placed Grout Volume of Auger Cast Piles

The first objective of this research project is to obtain field data from ACIP pile projects to better correlate the measured grout volume to the as-built pile dimensions. A second objective is to develop a more reliable method for estimating grout volume by identifying the variables that affect pile volume other than the simplistic approaches used to date. These variable are likely to include but are not limited to soil type, construction means methods, and types of equipment.

    Language

    • English

    Project

    • Status: Active
    • Funding: $176352
    • Contract Numbers:

      BED25 977-04

    • Sponsor Organizations:

      University of South Florida, Tampa

      Department of Civil and Environmental Engineering
      4202 E. Flowler Avenue, ENB 118
      Tampa, FL  United States  33620-5350
    • Managing Organizations:

      Florida Department of Transportation

      Research Center
      605 Suwannee Street MS-30
      Tallahassee, FL  United States  32399-0450
    • Project Managers:

      Castellanos, Juan

    • Performing Organizations:

      University of South Florida

      4202 East Fowler Ave, FAO126
      Tampa, Fl  United States  33620
    • Principal Investigators:

      Mullins, Gray

    • Start Date: 20220331
    • Expected Completion Date: 20241031
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01841074
    • Record Type: Research project
    • Source Agency: Florida Department of Transportation
    • Contract Numbers: BED25 977-04
    • Files: RIP, STATEDOT
    • Created Date: Mar 29 2022 11:13AM