Development of Non-proprietary Prefabricated Solutions for Concrete Barrier Systems for Accelerated Bridge Construction
A combination of limited prefabricated barrier systems and the new Manual for Assessing Safety Hardware (MASH) crash testing requirements is limiting the full adoption of accelerated bridge construction (ABC) techniques by state departments of transportation (DOTs). Precast concrete barriers were previously crash tested to requirements levels published in NCHRP Report 350: Recommended Procedures for the Safety Performance Evaluation of Highway Features. Some of these barriers were evaluated for test level (TL) 3. However, state DOTs are moving to higher level designs with TL 4 becoming more common and some state DOTs are moving to TL 5. An ongoing pooled-fund research project TPF-5(367): Evaluation and Full Scale Testing of Concrete Prefabricated Bridge Rails (https://www.pooledfund.org/Details/Study/619) is MASH crash-testing a precast barrier system. However, with different agencies using different barriers (F shape, single slope, etc.), a need exists for additional barrier system designs that meet the current MASH barrier design/testing provisions. In addition to accommodating accelerated construction schedule, the desired prefabricated barrier systems need to include durable connection details. The objective of this research is to identify, develop, and MASH crash-test durable prefabricated versions of existing MASH or NCHRP Report 350 compliant barriers.
Language
- English
Project
- Status: Active
- Funding: $900000
-
Contract Numbers:
Project 22-56
-
Sponsor Organizations:
National Cooperative Highway Research Program
Transportation Research Board
500 Fifth Street, NW
Washington, DC United States 20001American Association of State Highway and Transportation Officials (AASHTO)
444 North Capitol Street, NW
Washington, DC United States 20001Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Project Managers:
Abu-Hawash, Ahmad
-
Performing Organizations:
Florida International University
10555 West Flagler Street
Miami, FL United States 33174 -
Principal Investigators:
Azizinamini, Atorod
- Start Date: 20221006
- Expected Completion Date: 20251005
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Accelerated bridge construction; Barriers (Roads); Concrete structures; Crash tests; Crashworthiness; Durability; Geometric design; Precast concrete; Prefabricated bridges
- Subject Areas: Bridges and other structures; Construction; Design; Highways; Safety and Human Factors;
Filing Info
- Accession Number: 01835630
- Record Type: Research project
- Source Agency: Transportation Research Board
- Contract Numbers: Project 22-56
- Files: TRB, RIP
- Created Date: Feb 7 2022 6:13PM