Development of a Continuous for Live Load Prefabricated Steel Accelerated Bridge Construction (ABC) Unit for Texas Bridges
The overall goal is to develop a system where prefabricated steel accelerated bridge construction (ABC) unit perform continuous for live load. The system must be: easily constructible, fast to assemble, durable long-term, safe, and cost-effective. The research teams will conduct a literature review to first synthesize what has been done by state departments of transportation and other agencies. The research teams will also evaluate the behavior of related TxDOT bridges through visual inspection and monitoring. The research teams will perform a system development program utilizing this information in conjunction with expert feedback from an Industry Review Panel (IRP) workshop (including the TxDOT Panel). The three (3) best system designs shall be selected for full-scale laboratory testing followed by an analytical parametric study. The research teams will compile and present the results at an IRP meeting with the TxDOT, where the final system shall be selected. The research teams will develop full Microstation details and specifications along with a user-friendly design guide. The guide shall identify the following: (1) Span length capabilities for girder sizes/depths/spacings. (2) General details for establishing live load continuity. (3) Closure pour details at interior bents and how to achieve acceptable deck stresses. (4) Structural steel splice details and acceptable tolerances. (5) Bearing layout to meet TxDOT substructure details.
Language
- English
Project
- Status: Active
- Funding: $759,995
-
Contract Numbers:
0-7112
-
Sponsor Organizations:
Texas Department of Transportation
125 E. 11th Street
Austin, TX United States 78701-2483 -
Managing Organizations:
Texas Department of Transportation
125 E. 11th Street
Austin, TX United States 78701-2483 -
Project Managers:
Dassi, Martin
-
Performing Organizations:
Texas A&M Transportation Institute
Texas A&M University System
3135 TAMU
College Station, TX United States 77843-3135The University of Texas at El Paso
500 W University Ave
El Paso, TX United States 79902 -
Principal Investigators:
Hurlebaus, Stefan
- Start Date: 20210901
- Expected Completion Date: 20250228
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Accelerated bridge construction; Laboratory tests; Live loads; Prefabricated bridges; Specifications; Steel bridges
- Geographic Terms: Texas
- Subject Areas: Bridges and other structures; Construction; Highways; Materials;
Filing Info
- Accession Number: 01782680
- Record Type: Research project
- Source Agency: Texas Department of Transportation
- Contract Numbers: 0-7112
- Files: RIP, STATEDOT
- Created Date: Sep 23 2021 9:47AM