Use of All Lightweight Concrete in Conjunction with UHPC Connection for Prefabricated Barrier System
The use of all lightweight concrete in barriers and in some cases bridge overhangs provides a reduction in the total weight of the barriers by almost 33% allowing the transportation of more barrier units on one truck and easy handling. Furthermore, in seismic regions, lighter barrier contributes to a lesser total mass of bridge superstructures which is beneficial in many cases. In this project, two barriers, made of all lightweight concrete, will be tested under static load test setup and the results will be compared to the specimens which are being tested under project number [ABC-UTC-2016-C3-FIU05].
Language
- English
Project
- Status: Active
- Funding: $35,000
-
Contract Numbers:
69A3551747121
-
Sponsor Organizations:
Accelerated Bridge Construction University Transportation Center (ABC-UTC)
Florida International University
10555 W. Flagler Street
Miami, FL United States 33174Office of the Assistant Secretary for Research and Technology
University Transportation Centers Program
Department of Transportation
Washington, DC United States 20590 -
Principal Investigators:
Azizinamini, Atorod
Mantawy, Islam M
- Start Date: 20210301
- Expected Completion Date: 20230804
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Barriers (Roads); Lightweight concrete; Load tests; Prefabricated structures; Static loads; Ultra high performance concrete
- Subject Areas: Bridges and other structures; Highways; Materials;
Filing Info
- Accession Number: 01766521
- Record Type: Research project
- Source Agency: Accelerated Bridge Construction University Transportation Center (ABC-UTC)
- Contract Numbers: 69A3551747121
- Files: UTC, RIP
- Created Date: Mar 8 2021 5:23PM