Implementation Assistance for the Kentucky Crack Test (KYCT)

Kentucky is currently in the process of implementing an asphalt cracking test and Hamburg rut test for asphalt acceptance. As part of this process, various projects have been let or will be let soon and will include this type of testing conducted by the contractor and the Division of Materials on a pilot basis. The contractors will share test information with Kentucky Transportation Cabinet (KYTC) for further analysis to assist in determining appropriate threshold/acceptance levels. Kentucky has also made other changes in asphalt mixture design processes in recent years that should be included in this analysis.

    Language

    • English

    Project

    • Status: Active
    • Funding: $205000
    • Contract Numbers:

      KYSPR 21-600

    • Sponsor Organizations:

      Kentucky Transportation Cabinet

      200 Mero Street
      Frankfort, KY  United States  40622
    • Performing Organizations:

      University of Kentucky, Lexington

      Kentucky Transportation Center College of Engineering, 176 Raymond Building
      Lexington, KY  United States  40506-0281
    • Principal Investigators:

      Rister, Brad

      Ashurst, Kean

    • Start Date: 20120200
    • Expected Completion Date: 20230630
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01751314
    • Record Type: Research project
    • Source Agency: University of Kentucky, Lexington
    • Contract Numbers: KYSPR 21-600
    • Files: RIP, STATEDOT
    • Created Date: Sep 3 2020 2:47PM