Multi-Span Lateral Slide Laboratory Investigation: Phase 1
While single span lateral slides have been adopted by many states and are a common ABC method for construction of bridges when short closure durations are needed, multi-span lateral slides are far less common. A multi-span lateral slide incorporates additional construction complexities that must be considered by the designer, agency and contractor.
Language
- English
Project
- Status: Completed
-
Contract Numbers:
69A3551747121
-
Sponsor Organizations:
Accelerated Bridge Construction University Transportation Center (ABC-UTC)
Florida International University
10555 W. Flagler Street
Miami, FL United States 33174 -
Performing Organizations:
Bridge Engineering Center
2711 South Loop Drive, Suite 4700
Ames, Iowa United States 50010-8664 -
Principal Investigators:
Freeseman, Katelyn
Dahlberg, Justin
Phares, Brent
- Start Date: 20200101
- Expected Completion Date: 20201231
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Bridge construction; Laboratory studies
- Subject Areas: Bridges and other structures; Construction; Highways;
Filing Info
- Accession Number: 01734785
- Record Type: Research project
- Source Agency: Accelerated Bridge Construction University Transportation Center (ABC-UTC)
- Contract Numbers: 69A3551747121
- Files: UTC, RIP
- Created Date: Mar 24 2020 12:48PM