Multi-Span Lateral Slide Laboratory Investigation: Phase 1

While single span lateral slides have been adopted by many states and are a common ABC method for construction of bridges when short closure durations are needed, multi-span lateral slides are far less common. A multi-span lateral slide incorporates additional construction complexities that must be considered by the designer, agency and contractor.

    Language

    • English

    Project

    • Status: Completed
    • Contract Numbers:

      69A3551747121

    • Sponsor Organizations:

      Accelerated Bridge Construction University Transportation Center (ABC-UTC)

      Florida International University
      10555 W. Flagler Street
      Miami, FL  United States  33174
    • Performing Organizations:

      Iowa State University, Ames

      Bridge Engineering Center
      2711 South Loop Drive, Suite 4700
      Ames, Iowa  United States  50010-8664
    • Principal Investigators:

      Freeseman, Katelyn

      Dahlberg, Justin

      Phares, Brent

    • Start Date: 20200101
    • Expected Completion Date: 20201231
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01734785
    • Record Type: Research project
    • Source Agency: Accelerated Bridge Construction University Transportation Center (ABC-UTC)
    • Contract Numbers: 69A3551747121
    • Files: UTC, RIP
    • Created Date: Mar 24 2020 12:48PM