Performance Testing of GRS Test Piers Constructed with Florida Aggregates - Axial Load Deformation Relationships

Project objectives are to perform a background review of the literature and reports on GRS structures and pier tests. Design full-scale axial load-deformation tests of GRS piers. Construct and test each GRS pier. Compare the performance with current design methods and proposed methods. Make recommendations to Florida Department of Transportation (FDOT) for predicting axial load capacity and vertical and horizontal deformation.

    Language

    • English

    Project

    • Status: Active
    • Funding: $247762
    • Contract Numbers:

      BDV31 977-131

    • Sponsor Organizations:

      Florida Department of Transportation

      605 Suwannee Street
      Tallahassee, FL  United States  32399-0450
    • Managing Organizations:

      Florida Department of Transportation

      Research Center
      605 Suwannee Street MS-30
      Tallahassee, FL  United States  32399-0450
    • Project Managers:

      Jones, Larry

    • Performing Organizations:

      University of Florida

      207 Grinter Hall
      PO Box 115500
      Gainesville, Florida  United States  32611
    • Principal Investigators:

      Wasman, Scott

    • Start Date: 20200227
    • Expected Completion Date: 20220901
    • Actual Completion Date: 0

    Subject/Index Terms

    Filing Info

    • Accession Number: 01732417
    • Record Type: Research project
    • Source Agency: Florida Department of Transportation
    • Contract Numbers: BDV31 977-131
    • Files: RIP, STATEDOT
    • Created Date: Feb 28 2020 1:12PM