Economic Pier-to-Pile Connections for Permanently Cased Shaft (CFST) Piles

A missing piece of this new structural system is the foundation system including the direct pier-to-pile connection and the contribution of soil-structure interaction on this is an economical solution that reduces the cost of the structural foundation system. The overall goals of the proposed research are to: (1) Investigate concrete-filled steel tubes (CFST) connections and other column-to-pile connections through a literature review. (2) Select column-to-pile connections for study based on the finite element analysis (FEA) results. (3) Investigate the seismic response and resilience, including damage, of selected CFST connections using large-scale testing. (4) Develop, in collaboration with WSDOT and Caltrans as well as other interested transportation agencies, new design methods for these connections. (5) Develop a simplified nonlinear spring element to simulate the connection and pair the engineering demand parameters from the model to the damage states to provide tools for PBEE.

Language

  • English

Project

  • Status: Active
  • Funding: $70000
  • Contract Numbers:

    69A3551747121

  • Sponsor Organizations:

    Accelerated Bridge Construction University Transportation Center (ABC-UTC)

    Florida International University
    10555 W. Flagler Street
    Miami, FL  United States  33174

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    Accelerated Bridge Construction University Transportation Center (ABC-UTC)

    Florida International University
    10555 W. Flagler Street
    Miami, FL  United States  33174

    USDOT/OST-R

    Washington DC,   United States 
  • Project Managers:

    Lehman, Dawn

  • Performing Organizations:

    University of Washington, Seattle

    Civil and Environmental Engineering Department
    201 More Hall, Box 352700
    Seattle, WA  United States  98195-2700
  • Principal Investigators:

    Lehman, Dawn

    Roeder, Charles W.

  • Start Date: 20200101
  • Expected Completion Date: 20230804
  • Actual Completion Date: 0
  • USDOT Program: Advanced Research
  • USDOT Program: Research and Development
  • USDOT Program: University Transportation Centers
  • Subprogram: Bridge Safety
  • Subprogram: Pedestrian Safety
  • Subprogram: Research
  • Subprogram: safety in bridges

Subject/Index Terms

Filing Info

  • Accession Number: 01731831
  • Record Type: Research project
  • Source Agency: Accelerated Bridge Construction University Transportation Center (ABC-UTC)
  • Contract Numbers: 69A3551747121
  • Files: UTC, RIP
  • Created Date: Feb 24 2020 5:05PM