Performance of Existing ABC Projects – Inspection Case Studies (Iowa State University)

Accelerated bridge construction (ABC) has been implemented with greater frequency over the last decade, with successful projects geographically spread across the country. As these initial deployments of ABC methods age, it becomes necessary to inspect the structures for both maintenance decision making and for assurance of adequate service life performance. Detailed inspection information allows for active management of the infrastructure and assessment of performance via key metrics. As such, inspection protocols will be established and a broad assessment of the performance of past ABC projects across the nation using consistent and effective inspection methods and metrics will be performed. As the initial deployments of ABC methods age, it becomes necessary to inspect the structures for both maintenance decision making and for assurance of adequate service life performance. Current inspection methods used for traditional bridge structures can be modified to establish inspection protocols for ABC projects. Once inspection protocols have been developed, existing ABC projects can be inspected. After which, any apparent performance trends can be documented and best practices identified.

Language

  • English

Project

  • Status: Active
  • Funding: $50000
  • Contract Numbers:

    69A3551747121

  • Sponsor Organizations:

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    Accelerated Bridge Construction University Transportation Center (ABC-UTC)

    Florida International University
    10555 W. Flagler Street
    Miami, FL  United States  33174
  • Performing Organizations:

    Iowa State University, Ames

    Center for Transportation Research and Education
    2711 South Loop Drive, Suite 4700
    Ames, IA  United States  50010-8664
  • Principal Investigators:

    Freeseman, Katelyn

  • Start Date: 20190101
  • Expected Completion Date: 20230804
  • Actual Completion Date: 0
  • USDOT Program: University Transportation Centers
  • USDOT Program: University Transportation Centers Program

Subject/Index Terms

Filing Info

  • Accession Number: 01700448
  • Record Type: Research project
  • Source Agency: Accelerated Bridge Construction University Transportation Center (ABC-UTC)
  • Contract Numbers: 69A3551747121
  • Files: UTC, RIP
  • Created Date: Mar 30 2019 3:19PM