Condition-based Inspection and Restoration Scheduling of Pavement and Bridge Systems for Improved Post-disaster Infrastructure Systems Recovery

The key objectives of this proposed research effort are: 1) Develop techniques to support recovery efforts through joint post-disaster scheduling of inspection and roadway/bridge restoration activities; 2) Create capabilities for exploiting updated, damage condition information received from sensor technologies and designed inspection actions; 3) Ensure computational efficiency necessary for large-scale settings with hundreds or thousands of roadway links and bridges; 4) Take into consideration the existence and pre-event location of multiple, inspection and repair crews (pavements, bridges and other infrastructures) with stakeholders representing different assets with potentially competing objectives; 5) Account for impacts on overall traffic system performance; 6) Explicitly recognize effects of downtime from potentially interacting inspection or restoration actions on traffic system performance and accessibility; and 7) Describe how developed mathematical techniques can be utilized in practice.

  • Supplemental Notes:
    • This project is being completed from the George Mason Core Funds allotment.

Language

  • English

Project

  • Status: Active
  • Funding: $117526
  • Contract Numbers:

    69A3551847103

  • Sponsor Organizations:

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    Center for Integrated Asset Management for Multimodal Transportation Infrastructure Systems (CIAMTIS)

    Pennsylvania State University
    University Park, PA  United States  16802
  • Project Managers:

    Donnell, Eric

    Rajabipour, Farshad

  • Performing Organizations:

    George Mason University

    School of Engineering
    CEIE Dept., MSN-6C1
    Faifax, VA  United States  22030
  • Principal Investigators:

    Miller-Hooks, Elise

  • Start Date: 20190311
  • Expected Completion Date: 20230331
  • Actual Completion Date: 20211001
  • USDOT Program: University Transportation Centers

Subject/Index Terms

Filing Info

  • Accession Number: 01699731
  • Record Type: Research project
  • Source Agency: Center for Integrated Asset Management for Multimodal Transportation Infrastructure Systems (CIAMTIS)
  • Contract Numbers: 69A3551847103
  • Files: UTC, RIP
  • Created Date: Mar 25 2019 10:56AM